Spot lights, thanks to a uniform distribution over the ceiling surface, allow lighting of the entire room and furniture items that are in it. Other lighting fixtures, such as a chandelier or sconce, can not cope with this task. After all, they are installed in the central part of the ceiling. Since light will come from one point, the appearance of shadows is inevitable. Let's consider more details of a choice and installation of dot fixtures.

Contents

  • Features of
  • luminaires
  • choice of mounting materials Selection of
  • mounting materials How to arrange spotlights on the ceiling
  • Dot lighting layout
  • How to connect the
  • holes How to connect the spotlights
  • How to mount the
  • How to install the spotlights on the suspended ceiling
  • Conclusion
  • Variety of fixtures

    Point lighting elementsare divided into several types. Distinguish:

    • waybills;
    • embedded models.

    Instruments belonging to the first type are fixed using special elements - clip. This allows you to install overhead spotlights on vertical and horizontal surfaces of brick, concrete or plasterboard. The decorative part of these devices is located outside, than they differ from the built-in elements. Such lamps look more massive, so they are not always suitable for use in small rooms. However, their main advantage is the extensive choice of design. Today, you can find overhead lamps with glass shades, decorated with various patterns, as well as with crystal pendants or decor in the form of leaves and flowers.

    Built-in point lights are divided into several types. Distinguish:

    • fluorescent;
    • LED Light;
    • halogen instruments.

    Each of them is distinguished by its operational properties. The main advantage of luminescent models is the energy-saving principle of operation. These lamps can save 80% of electricity compared to incandescent lamps. But choosing in favor of these lighting devices, it should be borne in mind that the lamps with which they are equipped contain mercury vapor. The concentration of this substance is very low, but care must be taken when working with these lamps.

    Luminescent-spot lights

    The advantages of halogen appliances include environmental safety and long life. They radiate a bright, as close to natural light as possible. In addition, halogen models allow you to get a wide variety of colors. Characterizing the performance of these devices, one should also mention their specific shortcoming. Halogen lamps are not energy-saving. To save electricity with their help will not succeed. They can also be damaged by a voltage drop.

    double-recessed-halogen lamp

    LED spotlights for energy saving ahead of luminescent devices. These models have glass or plastic diffusers. Under them are located LEDs, which provide lighting. LED devices can emit white light( it is divided into cold and warm glow) and colored( yellow, blue or red).They withstand voltage drops of up to 60 V. But these lamps are an order of magnitude more expensive than halogen and luminescent models.

    Spot lights. Photo:

    tempus_

    spot_lighters_ for gypsum-cardboard_ ceilings__0

    in_big_32_auto_auto_jpg

    Features of the choice of mounting materials

    1. Lamps for spotlights should have a retro-reflective layer in the bottom of the plinth. In the process of purchase, you should check its availability.
    2. The power of the lamps should not exceed 40 W.In the opposite case, the ceiling structure will heat up, which will lead to its spoilage or to a fire.
    3. When choosing a cable, you should be guided by the material from which the ceiling is made. Gypsum cardboard has resistance to fire, so you can stay on a two-wire or three-core wire.
    4. Plastic and MDF do not have this property. To work with these materials, RKGM wires are selected that meet fire safety requirements. It's a copper incombustible cable. It consists of two layers:
    • outer is made of lacquered fiberglass material;
    • inner is made of very strong silicone rubber. Such a wire is capable of withstanding temperature loads in the range from -60 ° C to + 180 ° C.It is used for rooms with a high level of humidity and sharp temperature changes, such as saunas and baths. Therefore, the fire safety of this cable can not be doubted.
    1. Terminals are used as connecting elements, which can be purchased at a hardware store.

    In the future you need to double check the connection twice a year. There is a possibility of excessive heating of the contact area of ​​the wires and terminal blocks. Avoid this situation can be with the help of copper lenses, which have acquired a reputation for more durable and reliable fasteners. The connection area is isolated using a special tape or heat shrink tubing.

    device
    How to arrange spotlights on the ceiling

    For installation, the following materials will be required:

    • spotlights;
    • power wire;
    • switch;
    • lamps;
    • insulation tape;
    • sleeves or terminal blocks, which connect the wires.

    The installation process consists of several stages, the first of which is planning. Before the installation, you must decide on the location of the fixtures on the ceiling surface. This requirement is especially important for multi-level structures.

    All levels are selected as separate lighting circuits. Fixtures should be located from each other at a distance of 1 m, and from the wall - 60 cm. They should be placed in such a way that does not affect the elements of the frame. Between the hole for the point devices and the nearest frame part, it is necessary to save a space of 30 mm. Otherwise, the structural profiles will prevent the fixing of the fixtures.

    In the distribution process, you need to take into account other lighting devices installed on the ceiling. And also decorative elements. If all devices are planned to be used simultaneously, spot lights can be placed on the sides.

    Design-pendant-ceiling-with-backlight
    Spot light distribution

    The next step is to distribute the wires. There are two types of placement:

    1. According to the first, the fastening is performed during the installation of the frame. In this case, when installing luminaires, you simply drill holes, get wire loops and connect devices.
    2. If this procedure was lost during the installation, the cable is fed to the first hole, and the remaining wires are passed from one hole to the other. It is impossible to fix them on the frame elements. The wires will be located on the surface of the ceiling.

    With the preliminary placement of the cable, it is laid along the route for the installation of point devices. At each point a bent wire loop of up to 15 cm is left. The fastening to the frame is carried out by means of plastic ties. In this case, the fastening elements do not need to be fixed very tightly, the wires must hang slightly. Since the cable has the property of changing its length at thermal exposure, this approach will prevent its spoilage. Then you can proceed to the roofing of the ceiling structure.

    setting_of_light_lights
    How to prepare holes

    The distribution of luminaires on the surface of the ceiling is finished after the structure is clad. In addition to the distance separating the devices from the frame elements, one must also take into account the location of the joints between the ceiling components. If the location of the luminaire coincides with the seam, it is moved to the central part of the strip.

    For drilling holes use a crown for working with wood. With the help of this tool, grooves are also prepared for the sockets. The holes are absolutely straight, which contributes to the quality installation of lighting fixtures in plasterboard.

    When determining the diameter, you should focus on the fixtures. The hole must be 3 mm less than the outside of the instruments and not exceed the parameters of the inner part. In most cases this is 60-75 mm.

    lighting_light_ lighting-2
    How to connect point lights

    Next, you can proceed to the connection phase. To do this, proceed as follows:

    1. The holes of the pre-installed cable must be removed from the holes. In his absence, a different approach is used. From one hole to the other, two wires are laid. Work begins with the cable to which the power is connected. It must be remembered that before you start to connect, you must always disconnect the wire.
    2. The loops of the laid cable should be stripped, but before that they are cut in the bend area.
    3. To connect one lighting fixture, two 10 cm long wiring is required.
    4. The cable from each side is bare by 15 mm. One end of the short wiring is placed in the terminal, then clamped, the other is twisted with a cable that provides power.
    5. During connection, the markings on the lighting elements should be taken into account: PE corresponds to grounding, N - to zero, L - phase.

    f0e7f444222dbb521e0a6cf4f3cfb56c

    Mounting method

    On the sides of the spotlights for the ceilings are two staples, through which the fixture is mounted. These parts should be bent in the upper direction to the stop and so put into the hole. It is important to pay attention to the wires, they should not fall under the hooks, which press the lighting elements to the ceiling and firmly fix them there.

    After connecting all the luminaires to the junction box and switch, the main power cable is connected. When using low-voltage LED devices, the wire is connected to a lowering power source. This concludes the work.

    102-0233_01

    How to install spotlights on the suspended ceiling

    To work with a tensioning structure you will need a mortgage ring-shaped part. It can be purchased or manufactured in-house. This element must match the shape of the fixtures. This should be taken into account when working with triangular or square devices. For the production of the embedded part, it is necessary to prepare a dense material with a thickness of up to 6 mm, which can be easily processed and does not exfoliate. These requirements correspond to plastic.

    Further installation work is carried out in the following order:

    1. Using a compass on the prepared material, it is necessary to draw a ring. Its diameter by 2 mm should exceed the size of the lighting device. The distance between the outer and inner radii is 25-30 mm.
    2. Then, using the jigsaw, according to the drawn lines, the required part is cut out.
    3. For the fixing of the base element, use the bracket of the U-shape. Its flexibility allows you to place the part on one level with the ceiling film. This can be done even after installation of the structure. First, the bracket is attached to the ring by means of screws.
    4. The entire structure is then mounted with a dowel into the ceiling. All mortgage elements are manufactured and installed in this way.
    5. Now, in order to perform the installation of lighting equipment, it is necessary to cut holes in the film. It is important not to damage the ceiling.
    6. Before you start cutting holes, you need to glue a stopper to the film, the presence of which will help maintain its integrity. For this purpose, it is also necessary to prepare a ring. But this time you should use a material whose thickness does not exceed 1 mm, and the width corresponds to 10 mm.
    7. This ring must not extend beyond the outer edges of the decorative lining of the luminaire. It is fixed on the film with the help of super-glue over the hole of the embedded element.
    8. After 2-3 minutes, when the adhesive is started to act, a fragment of the film is cut inside the ring with a sharp knife.
    9. Then the wires are extracted from the hole, and the lighting fixtures are mounted in accordance with the same principle as when using a suspended ceiling.
    10. When placing spotlights on a stretch ceiling, follow similar rules.

    location-point-lighting-on-tension

    Conclusion

    Point light fixtures differ in small parameters and consume a small amount of electricity compared to other luminaires. The process of their installation is quite simple. You can install these devices yourself on a suspended and stretched ceiling. Work with tension structures has some features. On such ceilings, special inserts of heat-resistant plastic must be installed in the mounting areas.