How to glue stekloizol

Stekloizol - surfaced modern web material for waterproofing of building structures, roofing analogue.Its main difference from other web materials is that the foundation is Stekloizol fiberglass or fiberglass, so it becomes a non-combustible roofing has increased tensile strength and service life of 15 years, even in the most adverse conditions.

How to glue stekloizol

How to put stekloizol

Scope Stekloizol in construction is extremely high: from hydroprotection foundations to perform the vertical waterproofing of structures in the water, such as bridge supports.Widely it is used for waterproofing of the roof, and, in contrast to the roofing material, can be used on roofs with any bias, it is important to only select the right brand Stekloizol.

Marking and types Stekloizol

alphanumeric markings used for marking Stekloizol.The letters have the following meanings:

  • first letter "X" or "T" determines the base material, canvas or cloth, respectively;
  • second letter "P" or "K" defines the type of the upper layer of material, polymer film or sprinkling coarse granite;
  • third letter "P" characterizes the lower layer of the material - a polymer film;
  • figures in the marking means the weight of the material.

When the device roofs to improve the reliability typically used two or more layers of material, the lower of which is made of a backing Stekloizol marked CCI, or HSP, and the top - of roofing, marked HSS or TAP.

Stekloizol based glass has higher strength characteristics, so it is used on structures experiencing higher loads.Stekloizol based on the canvas are usually used for waterproofing foundations or roofs with a slope of up to 10 degrees.

Stekloizol roll has a width of 1 meter, thus from one edge of the roll is made the band without a topcoat designed to perform overlapping bands.Roll length - 10 or 15 meters.

Materials and

tool to cover Stekloizol roof needed:

  • Stekloizol underlay and roofing.Before buying you must calculate the required amount of material, taking into account allowances and overlap the edges of the roof;
  • primer or undercoat, polymeric or asphalt mastic;
  • cement-sand mixture for filling potholes and cavities in concrete;
  • sharp knife for cutting the material;
  • Blowtorch;

Hand rink.You can replace a piece of pipe with a diameter of 20 cm.

Technology laying Stekloizol

  1. Preparation of concrete surface before laying Stekloizol lies in its clean-up of debris, dust, dirt, stains and solvents, oils and resins.The old coating is removed in the event that it is easily removed from the surface.If the concrete base has sharp edges, protrusions, they must be cut and sanded.Potholes will be overwritten by the cement-sand mixture.The concrete surface is coated with a primer or a polymer-based cold bitumen primer in one or two layers.This improves the adhesion to the substrate when Stekloizol naplavlenii.Pri Stekloizol laying on wooden roof is necessary to perform continuous crate of edging boards or waterproof plywood and cover it with mastic bitumen or polymer-based.

    The concrete surface is coated with a primer

    concrete surfaces coated with primer

  2. Stekloizol Laying begin with nesting material.Stekloizol rolled out at the place, leaving allowances on hem 20 cm on each side.You must also take into account the margin for overlapping bands -. This is provided on a roll Stekloizol strip material without the top layer of 10 cm after cutting the strip layout and re-rolled into individual rolls.

    Laying Stekloizol

    Laying Stekloizol

  3. Begin laying with the lower edge of the roof so that the strip to overlap the rolls facing towards the roof.The first layer is laid podkladochnyystekloizol brand HSP or CCI.Roll lightly rolled, roll out of the uniformly heated using a blowtorch to a white plastic film and pressed against the roof, laminating stekloizol hand roller.Again gently unroll a roll and repeat the steps above.

    Technology laying Stekloizol

    stacking technology Stekloizol

  4. next strip glue overlap by 10 cm, on the edge of the previous strip without a topcoat.The number of layers depends on the backing Stekloizol roof pitch.It recommended to lay two or three layers of backing Stekloizol, shifting the strip on a flat roof with a possible stagnation of water, so that each successive layer overlaps the joints of the previous one.Places docking coating pipes, junction to the wall, the valley further glued strips Stekloizol overlapping on both surfaces.
  5. final layer of roofing Stekloizol with granite grit placed in a similar manner, careful laminating roller and avoiding the formation of air bubbles.
Rolling sheets Stekloizol granite grit

rolling sheets Stekloizol granite grit

service life of the roof covered Stekloizol in compliance with all recommendations is 15 years or more.If necessary, the roof can be repaired, putting in place separate lists Stekloizol without removing the base coat damage.