How much will it cost to build a house of aerated concrete - an estimate of materials and work

skolko_stoit_dom_iz_gazobetona use of this material belonging to the class of "light" concrete, considered one of the most economical building options.That's what he attracts primarily individual developers.Issues specific properties of aerated concrete, its brand, "plus" and "minus" is devoted to this article, we now look at only one - how much the construction will cost the house of concrete blocks?

precise data, even the most reputable professional will not be able to lead.The final amount of costs is determined by many factors, as the house - it's not just a concrete box with empty "sockets" instead of doors and windows, and complete the construction, in the construction that uses a variety of materials, equipment and engineering solutions.

Cost of AAC

first deal with prices.Specifics of pricing is that the cost of concrete blocks is determined not only by its performance, but also by the volume in which it is purchased - greater than the purchase, the substantial discount.

should be noted that the construction of aerated concrete more than 3 floor building is inappropriate, since in this case, enter the "contradiction" characteristics such as load bearing capacity of the individual units and their insulating properties."Middle ground" in low-rise buildings are considered to be products with density D500.This is sufficient for the optimal combination of the above parameters.

If you focus on averages, then 1 "cube" of such material will cost about 3800 rubles.




But if the house is planned at heights, it is sufficient to block and lower density.Accordingly, they will cost a little bit cheaper.

foundation

construction cost

Here one of two things - either based on their own, or hire contractors.The last will have to pay, but how much?If it's just a team, "the volunteers", called "shabashniki" the old fashioned way, they take relatively little - around 900 rubles / m³.But just as it was then to ask them, if after a certain period will begin with the house of the problem?

Services craftsmen working officially by a specialized firm, will cost more expensive - from 1 300 to 1 500 rubles / m³.The "RR / m²," it looks like this: from the 9500 box, ready to build 15,000 (without external cladding) and 19 000 - 22 000 "turnkey".

course, not the fact that the workers are up to one-class professionals and do the manufacturing operations at the highest level, but if something happens who will present a formal claim.Well, what is better - to save or "sleep" - you decide, dear reader.It is not superfluous to read reviews of the owners of gas-concrete houses.

dom_iz_gazobetona

Additional spending

They also need to assess, although the exact count, they can not be.It all depends on the preferences of the owners and the local conditions.Here are the main items of expenditure, which should be considered:

  • aerated concrete Foundation .Who will build and what type?For example, the strip foundations will require investments of about 2 250 rubles / rm, but it is easy to build with their own hands - read how to do it.;
  • Roof .If you use metal roofing, its installation will cost about 500 rubles / m²;
  • Connection email / network or acquisition unit electric / power;
  • Gasification (if possible);
  • water supply system (centralized or autonomous);
  • Sewerage (similarly);
  • remaining communication - telephony, internet, TV (cable, interactive).

It is clear that a lot of nuances.Given the use of a large product range and building and finishing materials is sufficient to give the following purely indicative data on the basis of which you can even plan your upcoming expenses.

For the same aerated D500 1 m³ whole house will cost 3150 rubles (without utilities).

Of course, this calculation is very approximate and involves the purchase of materials of medium price category, but still a basic understanding of the cost of building it offers.