Finishing the basement in a private home - dostatochnotrudoemky process, because this part of the building is in close proximity to ground level.Due to this it is necessary to pay attention not only to coating technology, but also the quality of the materials.Among modern species facing the greatest demand flooring ground siding.This type of material has a favorable ratio of cost performance and durability in operation.

Content

Types of cladding material for the foundation

To draw the outerbase side of the foundation can be used various kinds of materials.Among the most common types of coatings including the following:

  1. Plaster - the most common form of decoration of the cap, which is characterized by low price and poor performance.
  2. artificial or natural stone - quite aesthetic, strong and durable material, which has a high cost.
  3. Decorative panels - expensive type of coverage with a high aesthetic value and durability.
  4. Brick - durable material, but requires a troublesome relationship in the process of lining.
  5. Tile - a relatively inexpensive type of material, but it is not very durable and require time-consuming process of lining.
  6. Siding - affordable, wear resistant coating, which has a wide variability of colors and textures.

finish - cap - stone

Benefits cladding siding

basement finishing basement siding -the most optimal variant facing the house.This material is a vinyl panel, texture and pattern which exactly simulate natural stone or brick.This coating is not sensitive to the adverse effects of UV rays and moisture, as well as capable of withstanding temperature variations from -50 ° C to +50 ° C.Let us consider in more detail the benefits of siding plinth facing:

  • this type of coating has a low weight, due to which no additional load on the bearing wall of the building;
  • because of the material contains special additives siding very ductile and can withstand several cycles of expansion and contraction under the action of heat;
  • this coating protects the substrate from moisture, as well as quickly and easily mounted on the base;
  • siding is resistant to mechanical and physical effects;
  • coating has a long service life - about 50 years, and the panel does not require additional protection in the form of paint application;
  • basement finishing saydingompozvolyaet ensure proper ventilation of the basement level;
  • material has low heat conductivity, whereby heat is securely held inside the building;
  • variation of textures and textural solutions allows to issue building facade on an individual and original design.

2

Features of process of cladding siding

This type of material is universal, as is suitable for installation work on any surface.Today's manufacturers offer a wide variety of ground siding, which can simulate a natural stone and brickwork, slate, timber ship.This coating is very practical to care for its cladding need not possess special knowledge or skills.

However, basement finishing siding with their own hands, just like any other cladding process has some peculiarities.Let us consider them in more detail:

  1. panels of such material can be installed exclusively on a vertical plane of the facade.For this reason it is recommended to coat siding upper horizontal wall surface.
  2. Finishing the basement should be done in a clear sequence of panels stacking is performed from the left corner of the building to the right, starting with the installation of home plate.
  3. To provide room extra insulation, cladding ground level, it is desirable not to use a foil material, and "breathing".They need to be laid under the saydingovye panel.
  4. There must be taken into account possible changes in the geometric parameters of the surface, which are caused by temperature differences in the summer / winter time.To this must be provided a small gap at the joints between the panels themselves as well as final assembly cover elements.
  5. forbidden to make installation of siding on an unprepared surface.Attach the panel can be solely on lath or plywood boards that are sheathed base.
  6. Mounts, which serve to hold the coating on the surface, it is necessary to deepen not less than 10-13 mm.Thus it is necessary to install fasteners in the center of a specially provided holes.
  7. Do not twist fasteners until it stops, it is better to leave a small gap - about 1.5-2.2 mm.

Important! To calculate the necessary amount of siding panels for covering the cap of his house should follow this principle: footage of each wall in width must be divided by the length of one wall panel, and then summarize the findings.As for the height of the foundation level, there is only one saydingovogo fragment.If the cap is overvalued, you would need to multiply resulting in the first calculation result by 1.5.

3

Phased installation material

Before finishing foundation home siding, you should carefully prepare the surface walls.As previously noted, the primary challenge is mounting batten.Thus, the carcass forming process is as follows:

  1. originally should be recorded on the pedestal mounting base, which will hold the panel.It can be made of wood or galvanized metal profile.The second option is more reliable and durable.
  2. sequence of movements, attach the strap to the frame profile so that they are placed in a horizontal position.To verify, use the building level..

041

  1. If skin basement level you intend to use the panel in a row height, then you need the pieces with a width of 45-47 cm At the same time frame crates of metal sheets need to build a line of three - undersaydingovoy upper edge of the panel in the middle and near the base of the cap.
  2. Fixing strips occurs by means of screws and dowels, the length of which should be at least 8-10 cm.
  3. After that, you must make the installation of additional elements (starting and finishing strips, strips, etc.), As well as directly to the siding.
  4. Strengthen Home strip cladding coating is necessary to crate so that it was located strictly horizontally.For fixing screws are used, and the distance between fasteners should be about 30 cm.
  5. When facing the building reaches the angle, it is necessary to fix the corner element, which is mounted to the sheathing by a similar method.Allowance for the angular bandwidth should be at least 1 cm.

040

  1. At the end of the process casing must be secured finish the bar, which looks like a decorative fragment siding.
  2. After that, you can begin to trim the entire cap.The first cover plate is inserted into grooves of the strip and the original slides into the trough so that a small gap remains.
  3. then set the second panel.To do this, start a support bar and move it close to the first saydingovomu fragment.All assigned by analogy with the previous method.
  4. The same principle occurs in all trim cap.

Important! If necessary, the latter facing the coating element can be shortened a bit, and then attach it to the sheathing.Only then finish installing the corner bar.

4

finishing technology of pile foundation basement siding is presented in movies:

instagram viewer