The walls are made ​​of plasterboard with their hands

click fraud protection

Plasterboard (GCR) is a versatile material for leveling walls, creating an additional layer of insulation or for redevelopment of the room (the partition mounted).Working with sheets is quite simple, and on top of the resulting wall will not be difficult to paste wallpaper or tiles, to perform a simple painting.Depending on the subsequent operating conditions should be selected either normal or waterproof type.In any case, set the walls of plasterboard with their hands, everyone can master.

Content

  1. Preparation and installation of partitions of plasterboard
  2. step instructions for finishing the walls plasterboard
  3. Video installation wall plasterboard with their hands

Preparation and partitions installation of plasterboard

to perform a neat installation of plasterboard wall you will need to carry out marking on the floor, walls and ceiling, where it is expected to partition.Marks and lines for fastening of wires relative to the window and should be parallel to the other two walls.

According designated perimeter fastened with dowels guide hard profile, which will be a support for future construction.To understand how to make a wall of plasterboard, consider the following rule: rack profile must be turned rib in the direction which will start attaching sheets.If you are mounting from right to left, and the edges must be right.

If the partition is provided a door, it is necessary to carry out the hardening rack profile.This will require it to establish a board, is entirely consistent with the width and depth.Detailed video of the installation of the walls of plasterboard with their hands allow you to see the process firsthand and understand how it should look prepares construction.

Then the guides distributed rack profiles at a distance of approximately 40-60 cm apart.It should be borne in mind that the joints to hold the two sheets should be only one common profile.In this case, the structural strength is high.

In part, which is located above the door, you need to insert additional sections that provide rigidity mounting sheets and then make sure that the resulting solid foundation and can withstand the weight of screwed drywall.Join the sheets using a screwdriver and screws.On the joints to create the perfect plane carried pasting a thin plastic mesh and subsequent smearing plaster for leveling.At this stage, partition installation is complete, you can start to its finish.

step instructions for finishing plasterboard walls

Work on alignment or warming a little bit easier than installing partitions.For mounting need all the same rails and rack profiles.

1. Before the work is necessary to conduct a level markup, according to which will be mounted on the wall plaster.Guide profile is attached to the main wall, thus leaving enough space under the plasterboard for thermal insulation.

2. In markup produced installation guide profiles.Various photos of the walls of plasterboard attached to the article, during the construction will help to understand how to correctly carry out the installation.

3. At a distance of about 40 cm are exposed rack profiles.For their installation will need to attach to the walls of pre-hangers, which will build and vertical elements.Then, using screws rack profiles are connected to hang himself.

4. Held assembly of the first sheet of drywall.Under it, if necessary, is required to place a heater.Mineral wool is of high quality is ideal for this purpose.

5. Next cladding plasterboard with their hands held up to the edge, where it will interface with the other wall.Due Date sheets do not need to have.The master must take into account the width of the sheets, which will form an angle.

6. Upon completion of the plating performed study joints.When the composition dries, held wall decoration made of plasterboard.any decorative material may be used.

mounted and wall insulation will look quite stylish if it will be a niche or be withdrawn outlet.Of course in this case is carried out in advance drank holes.But we must remember that this work will take more time and require additional skills.

Video Wall mounting of plasterboard with their hands

instagram viewer