Mount Insulated otmostku own hands

Mount Insulated otmostku own hands

Insulated blind area is a prerequisite for building a house, since only in this case it is possible to achieve maximum protection of the foundation around the house from various external influences.

otmostka It allows not only to improve the quality of home, but also to increase its durability.

important not only to make it right, but warm and well, using for this purpose only quality and efficient materials.

blind area around the house is carried out for different types of foundations, including melkozaglublennogo.

insulation scheme blind area may be different, but in any case it is necessary to achieve maximum protection of the foundation and walls of the house.

for paving slabs, which serves as a blind area around the house, also need to think about how to properly perform insulation.

To all the work has been executed with their hands properly and in accordance with the technology, developed step by step instructions.

technology of works, as well as insulation scheme blind area around the house are simple and do not require professional skills, so you can do everything with their own hands, without resorting to the services of qualified builders.

Contents:

  • Nuances insulation otmostki
  • drainage Performing a blind area
  • Construction underlayment and insulation
  • formation of the surface layer

Nuances insulation otmostki

Generally, blind area is a strip of a certain width, whichIt extends around homes around its perimeter.

It can be performed by using paving slabs, concrete strips, or any other similar material.

indispensable condition of its implementation, for melkozaglublennogo, and for a different type of foundation, is a high-quality insulation.

The scheme of packing of the blind area

This allows to maximally protect the foundation of the structure from moisture income and exposure to low temperatures, which can lead to its destruction.

The role of insulation may be a very different matter, but in any case it involves the implementation of technology devices with their own hands a number of different layers.

So, be sure to make the underlying layer, and perform topcoat for the purpose by the use of paving slabs.

Such a cake of different layers will prevent the formation of mold and the destruction of the building materials that were used for the construction of the foundation, as well as the cap.

in a variety of materials can be used as insulation under the blind area.Maximum protection foundation helps polyurethane foam.

This foam is an effective waterproofing agent, which due to its flexibility is able to fill in all the cracks, thereby ensuring a good seal.

This material should only plank on a previously prepared foundation, and this will definitely need to make a special pillow from the rubble and build the formwork.

Video:

top of foam may be laying paving slabs.Also for insulating blind area around the house with your own hands, you can use Penoplex.

This material also effectively protects the foundation and the base, and in addition, the process and the technology of its styling is so simple that can be made with your own hands.

Penoplex should pave the entire surface of the perimeter of the house, adjusting the sheets to each other tightly as possible.

You can also use and ordinary foam, which in its properties similar to Penoplex.On top of these materials may be laying paving slabs.

Performing drainage under the blind area

Before you proceed directly to the most warming blind area around the house, be sure to do your own hands an appropriate drainage.

It is particularly relevant in case the soil around the foundation consists of soft clay has a high humidity, there is the risk of flooding, and so on.

In any case, drainage under the blind area can not hurt and will further protect the foundation of the house more.

It should equip for any type of foundation, including for melkozaglublennogo.

First you need to arrange a drain, and for this you can use ordinary plastic pipe.Further around the house you need to dig a trench whose depth should be up to one meter.

carefully leveled bottom of the ditch, you will need to make a small deviation in the direction of the well.It should also be strengthened and the pit wall, especially if the soil is soft.

Improved device blind area

prefabricated drains need to tightly wrap a special cloth, such as geotextiles.This is done to ensure that the holes Drenov did not get the land and the soil.

Next on all the bottom of the pit settling cushion in the form of gravel and well compacted.Thereafter, the entire perimeter of the pit drains themselves are exposed in sequence.

then need to perform their backfill with soil, with particular attention paid to the compaction of soil on the sides of drains as well as directly to the will of the foundation of the house.

After that, you can proceed to the next layer of the device blind area, which will serve as a kind of litter under the insulation, thus forming, a kind of cake made of different layers.

Construction underlayment and insulation

Underlayment is a prerequisite for performing insulation blind area around the building.

for its correct implementation is developed step by step instructions, following which it is possible to do all the work with his own hands.

To begin to make a layout adjacent to the house territory.After that, around the perimeter of the house in accordance with the markup removed the soil with a bayonet spade.

The following is the entire bottom of the ditch dug to lay clay and carefully compacted.

As a moisture barrier may be used building roofing material, which is spread over the surface of the pit in layers overlapping.

Then necessarily need to fill the bottom of the hole with a thin layer of sand and abundant water shed, and then densely compacted.

Video:

then formed formwork, which must exactly repeat the configuration of the future blind area.

After the formwork is fully formed on the hole perimeter of the pillow is made of rubble in its internal space.

Before you begin installation of the heater, the bottom of the pit is recommended to treat the bitumen or other similar structure.What follows is the most densely laid insulation itself.

All joints between them necessarily sealed.It is better if the insulation material is laid in two layers.

This will enhance the protective functions of the blind area, and even more will protect the foundation from the aggressive action of water and temperature.

is followed over the insulation to make podsypku sand thickness of not less than seven centimeters.

stacked on top of sand and gravel compacted carefully and then the reinforcing layer is formed of a metal mesh.

Only then can you start grouting around the perimeter of the exposed timbering.

poured concrete layers is recommended, while not forgetting to observe the required slope towards the well-equipped for rainwater runoff.

After this blind area must be given time to ensure that the solution is well dried up and became strong, and then you can proceed to the formation of the upper face layer.

formation of the surface layer

After you have fully completed their own hands the device blind area insulated and made her fill, and it is recommended to equip the upper face layer around the perimeter.

Of course, you can leave the top layer, and in this form, however, the implementation of the surface layer will not only improve the aesthetics of the blind area, but will make it more secure.

Types of blind area

For these purposes allowed paving tiles and other decorative materials.In that case, if you intend to use paving slabs need to be any gaps between the tile joints thoroughly fill with sand.

should be noted that equip the upper layer using the decorative elements should only be when there is confidence that the waterproofing and insulation of the blind area made properly and in accordance with the technology.

Generally, use as the surface layer of the blind area is paving slabs, it is the most popular option in this case may be not laying on the concrete base.

Do not skimp on insulation blind area around the house.

only quality insulation, made by all the rules, will best protect the foundation from moisture and low temperatures, and, consequently, increase its strength.

As a heater should choose high-quality modern materials, which can provide a good foundation of protection for many years.

selected as the insulation material must be placed only on the prepared base surface, the insulation sheets should be sealed to each other.

Video:

Running blind area of ​​the upper layer will protect the insulation from the aggressive external influences and, consequently, extend its service life.

In the event that all work on warming the blind area is executed correctly, the durability and strength of the house will increase significantly.