Work on installation of drywall on the walls

Work on installation of drywall on the walls

Installation of drywall on the walls, carried out with the use of frame or frameless technology, allows you to smooth the surface to an ideal condition while it is insulated layer of insulating material.

Working with sheets of plasterboard is easy and requires no special expertise, as evidenced by the proposed video story.

Ready plane walls easily ennobled by the use of ceramic tiles, a simple painting or wallpapering.

from moisture-resistant and conventional drywall construction to do?Choose the kind of material that will fully comply with the purpose of the room.

planning radically change the design of bedrooms, the living room or hallway, acquire conventional drywall sheets.

Their use makes it possible not only to align the wall, but also to organize them figured elements, arrange original niches and shelves with lighting.

If the repair is carried out in the bathroom, in the kitchen or other rooms with constantly high humidity, wall or ceiling acquire lists that are resistant to moisture.

Additional treatment products water-repellent primer allows your hands to increase the level of vapor resistance of the walls.

offer a view on the subject video material.

Video:

Contents:

  • Crate wood or profile - which is better?
  • Production of timber battens
  • frame mounting furring metal profile
  • thermal insulation of walls and installation of drywall on the crate
  • frameless plasterboard paneling

Crate wood or profile - which is better?

order in the process of drywall ideally lay on the walls and hide any defects, as shown in our video material, you need to pay attention to another important fact - mount frame.

technology facilities of this design is reduced to the plane of the wall layout and subsequent installation on their wooden or metal products.

Previously, plasterboard paneling performed on the wooden frame, wooden beams reasonable price speaks for itself.

But as wood behaves unpredictably, in the case of changes in humidity in the room, with the time preference for mounting battens under a covering began to give galvanized profiles.

But it makes sense to build a wooden structure with their own hands under the drywall installation, if there are dry sticks in hand.

Do not count on the timber, which is in the sale, by and large is a tree or svezheraspilennoe or has a high degree of humidity.Video

:

frame mounted such materials deform with time due to the drying of wood.

In any case, further information and video materials proposed will be useful for you.

It will examine how the framework installation as of timber and metal profile, with the subsequent laying of insulation and drywall installation.

Production of timber battens

frame of the timber can be fixed both on wood and concrete walls.In the first case the fixing elements is carried out by means of nails or screws, in the second - to use dowels.

provide training base before working with his hands.The walls of the house is treated with antiseptic primer.

Faced with a clean and well dried out the surface, go to the installation of the timber battens.

The work will involve:

  • fasteners;
  • hacksaw or a circular saw;
  • building level;
  • roulette;
  • wooden blocks.

Location leaves on the wall

rules installation of wooden crates:

  • Technology arrangement wooden frame for gypsum board starts with the layout of the working area and piping installation;
  • Using a tape measure, on the ceiling, on the floor, along the walls and in the corners of walls indented 200 mm mark the area of ​​fixing the guide rails;
  • by conventional hacksaw is adjusted for the desired size wooden beams, then fasten them with screws to the marked locations;
  • Proper positioning of the vertical guiding elements monitored using level;
  • primarily secure the bars on the ceiling, then move to the arrangement of piping below.Make sure the correct location of bars, fixed vertical guides on the walls;
  • on vertical elements crates will go to the main design load, so it is important to fix their quality;
  • distance between successive uprights must not exceed 600 mm.Their fixation can be done with screws or metal bracket.

If there are openings in the wall between the uprights, with their hands is carried out installation of the transverse bars.

the presence of electrical wires are placed in a corrugated protective cover.

frame mounting furring metal profile

frame mounting lathing of metal profiles for gypsum board begin, as in the first case, layout of the working plane.First, check the wall using a spirit level on the vertical drop.

Available deviations fixed and during marking work eliminate their own hands.A more detailed understanding of a metal frame technology, everything is possible in the proposed video.

Video:

mount technology metal profile on the wall:

  • Galvanized guiding profile is mounted on the markers applied lines.For each of the walls will need two profiles: one mounted on the wall near the ceiling indented 800-100 mm, the second - on the floor along the wall;
  • If necessary, align the horizontal gradient, a profile of the bar fits rigid element to the desired thickness;
  • guide profile on the ceiling placed a groove down.Profile, fixed to the floor, a groove up to allow their installation into strut members;
  • guides vertical elements of metal piping with his hands fixed on the corners of the wall is indented to 400 mm, the use dowels or screws;
  • For subsequent mounting rack profile on the wall is carried out vertical lines along them mounted hangers in increments of 400-500 mm, due to the design of their future get their rigidity;
  • edges rack profile is inserted into the grooves of the guide elements on the top and bottom, all fastened with screws;
  • simultaneous attachment to his suspension.Vertically installing rack-mount profiles control level.

thermal insulation of walls and installation of drywall on the crate

Regardless of the material used to produce a crate under a covering before you begin installation of sheets of drywall, insulation and sound conduct of work.

The thickness used for isolation walls materials will depend on the width of the inner rib structures.

as sound and heat insulating layer under the drywall, most often used mineral wool and Styrofoam plates.

Video:

segments selected insulation material is placed between the strut members crates, so fill the void that would be under the skin.

top of the insulating material with their hands equip parozagraditelnuyu membrane.The film in the junction glued with a special tape.

mount a vapor material to carry a wooden frame bar with the staple gun.

More information about the method of insulation of walls under the drywall will allow the next video material.

frame plating technology sheets of plasterboard:

  • required number of sheets of the product is calculated from the total working area of ​​the walls.This take on the stock even 10-20% of the material - flow of products will depend on the experience of the installer;
  • Fit sheets perform the required size on a pre-marked cut lines.Plasterboard fixed to the crate so that the seams of sheets placed on the rack profile axis and a profile strip in the middle of the sheet.

Before his own hands to carry out installation of drywall sheets in the crate, it is recommended to move the location of their plan on paper.

This will allow pre-cut sheets to the appropriate segments and quickly navigate to their place of installation.

frameless plasterboard paneling

technology frameless plasterboard wall cladding provides adhesive attachment sheets.

As a rule, due to furring device reduces floor space, so its use is not always appropriate.

drywall installation technology on glue made with minimal loss of space and does not require much time.

Depending on the characteristics of the working surface can be used a variety of techniques drywall adhesive device.

Video:

For example, the support base with the plane drop to 20 mm, plasterboard wall covering used special glue "Perfliks".

Glue is applied to the product small slides, press down with your hands the sheets to the wall, allowing you to align the surface.

If irregularities in the substrate is about 50 mm, the sticker sheet of drywall is carried out in two stages.Initially, the adhesive is thrown narrow strip of drywall.

top of them with a special putty gypsum-based core mounted sheets.

above actions take place in the following order:

  • base is prepared and selected equipment drywall adhesive.Walls purified exfoliated from the old finish, after which the wall clean and free counting performed.The paper used a plumb and level of construction;
  • Before drywall mounted on the glue, the work plane is treated soil composition, which is selected depending on the characteristics of the wall;
  • Once the wall dries, proceed to cutting the material and the subsequent assembly work.
    on prepared sheet of drywall with his working hand throw glue to the distance between the slides 20-30 cm. Then apply a sheet of drywall to the wall, aligned horizontally and vertically, and then using a rubber mallet compacted material.

add theme frameless plasterboard wall cladding allows video plot.

Video:

instagram viewer