Sewage in the bath with his hands , or how to do everything with the mind ?

How to sewers for the bath with his hands?

As already mentioned, it is sure to provide drain (diversion drains) in the construction of the bath.Carry out work in the following order:

  • From foundation recede approximately 50 cm and dig drainage well at a depth of 1.5 meters on average (when soil freezing by 60 cm).The size of the well - meter on.
  • Well fall asleep any material having a drainage properties, such as gravel or expanded clay.It is enough to put a mixture of 0.5 meters (just over the level of soil freezing).
  • remaining space fill up the usual land and properly tamped.

Important!For a truly qualitative performance of works it is necessary to comply with the technology.If the technology is not performed, the water from the sewer pipe will not flow out and will begin to accumulate under the floor and in the tube itself.As a result, the floor begins to rot.

  • In the event that the soil does not absorb sewage, it is better not to make such a well and build a forward flow.It is important that it be sealed in order to avoid the spread of various odors.The water will flow down the sloping of the drain.
  • done it as follows.At a height of 9-12 cm from the bottom of the pit (forward flow) is introduced spillway pipe.On three sides it is mounted special plate.On the fourth side (bottom) is fixed.The plate creates a shutter, it does not reach the bottom of approximately 5-6 cm. Therefore, odors do not fall into the bath.

As can be seen from the above, the outdoor bath for drainage is quite simple.But in the bath and have interior drainage, tell about it below.

Plumbing equipment

Internal sewage in a private home includes a number of mandatory sanitary equipment.The bath has a shower, toilet, bath and dressing room.In shower water goes through the drains.Produce them from plastic or cast iron.The design and shape them may be different.To the water flowed toward the ladder, the floor make a slight slope.

WC provides installation brass shell and connect it through a siphon.In steam floor also makes a slightly inclined to the side, where the water inlet channel.There are also ladders with a special water-sealed.Place them in the course of movement of water and is connected to the sewer pipe.

In the dressing room there font, made of wood.The water is drained out of the font in the usual manner as the bathroom.By all SES drains are removed from the bath into the drain well or sump.If there is a toilet in the bath, it is necessary to install a septic tank with the activated sludge.That he will purify wastewater.

Sewerage for bath: the scheme

about how to make the drains in the bath described above.Total is 3 sewerage system:

  • Gravity (system pipes are located on slopes, drains out by gravity method).Suitable for buildings having a height of 10 meters.
  • Pressure (first come drains by gravity method in a special collection, the transfer pump and cleaned).
  • Connected to the central sewer system (drains all go to the Central Committee).

circuit each include moldings and a diameter of 50 to 100 mm and non-pressure-walled plastic pipes, total about 3.5 mm thick.For sealing all connected by special seals.Make outlet system with a minimum number of branches.The collector sewer outputted to an exhaust pipe, which drains from the drainage well fall.