should not talk about the problems of centralized water supply.With this encounter, even those who are already connected to a common line.Owners of private buildings from this point of view, are in a better position than the owners of city apartments, as they have the freedom to choose.And build an autonomous water supply system is often much easier than running around the chain of command and to decide on the quality of water supplied and its pressure.
If the site is already a source as well, the supply process more expedient to automate than to carry out the method of carrying buckets.It's enough to install and connect the pump station and a wide range of such products allows you to make the optimal choice for any individual model site and buildings.
Some people who have not previously faced with similar questions, do not understand the difference between the ordinary and the water pump station.We can say that it is about the same as between the combustion engine and the vehicle.In other words, it is a complete kit that will provide both work and protect the pump and the entire system from all sorts of "trouble."
We do not understand the intricacies of the various enforcement mechanisms.Whatever the solution may be put into practice, the station is fully stocked device, which only needs to be included in the system.For all models, the connection schemes are basically the same.
Station Setup
It must be securely locked in place, otherwise avoid its displacement during operation, and it is - break the connection sites and depressurization system.Therefore, next to the well is necessary to prepare a solid "pedestal".Concreting of the small area is not too much difficulty.
It is only necessary to consider that, first, the station must stand without any distortions.Therefore it is necessary to achieve flatness.Secondly, during operation it will maintain and repair.So, around should be free space, providing easy access to the unit from all sides.
If the station is installed at the site, it is necessary to take measures to protect it from environmental influences.First, low temperature.Therefore it is necessary to mount something like a short "warm" house, within which you can work (maintenance, repair).
Installation inlet line
station with a well connected and strong, rigid hose or pipe.Length is selected from this calculation to its submerged end towered above the bottom about 25 - 30 cm, otherwise there will be silting line.
Next: when the pump is switched off, the water can go in the opposite direction of the pipe (the pump will remain dry) and after turning it happen "idling.To eliminate this, at the tube closer to its end, the check valve is installed.And in the end necessarily mounted strainer.Typically, this mesh and the best of the polymers, since such products do not rust.
cross section is chosen depending on the pipe diameter.All threaded connections necessarily sealed, otherwise avoid water leaks and air leaks.The latter will cause interruptions in operation of the pump, hence also in choppy water will enter, if not go.
Mounting output line
Its tube is connected to the station is similar.
Electrical connection
The first station must be grounded.This requirement applies to all similar units.Cable connection is made on a "rasklyucheniya" pump, which is in its accompanying documentation.
Needless to say that all pipelines should be laid and insulated so as to prevent them from freezing.