Installation of metal siding

click fraud protection

Metal siding is a panel on a metal base, visually reminiscent of the wooden paneling house block.As raw material for the manufacture of these products use a very thin galvanized steel.The outer side is covered by a polymeric coating, which provides the external aesthetics of the material.To learn how to select and install the siding will be discussed in this article.

Content

  • Features metal siding
  • preparatory stage of work
    • frame assembly rules crates
    • Stage installation insulation material
    • Features laying waterproofing and windproof material
    • Terms installation dobornyh parts
    • Connecting elements of the complextype and seal
  • Stage installation of siding
  • Conclusion

Features metal siding

This type of cladding material appeared in the construction sector is relatively recent, but today it has become one of the most popular products for outdoor decoration.After lining metal siding house becomes quite attractive appearance.But the purpose of the material is not limited to only a decorative function.The task of these panels is also to protect the building from negative influence of UV rays, atmospheric influences, as well as in the creation of a sound-insulating effect.However, it is important to consider the fact that to effectively address assigned to the functions of the siding, installation of the panels must be performed in accordance with specific requirements.

Among the advantages of siding should also designate such features:

  • material is resistant to various atmospheric influences;
  • with low weight has sufficient strength;
  • contains not contain toxic elements;
  • not need to be updated throughout the entire period of operation;
  • available material costs;
  • has low resistance to heat and corrosion;
  • a wide choice of colors;
  • mount technology this material is quite simple;
  • siding is fairly easy to transport.

Metal siding.Photo:

color - metal - siding

metal siding , logs

preparatory stage of work

Before installing metal siding work surface should be properly prepare:

  1. Preparatory actions are to eliminate the various decorative elements, protruding parts and plants.
  2. If possible, it is also recommended to remove protruding fragments of window sills.That is, you need to remove anything that might interfere with the installation actions.
  3. Upon completion of works will greatly increase the load on the load-bearing walls.This point is also to be taken into consideration and accordingly prepare wall.
  4. Applying the level necessary to ensure that no distortions of corners and walls.
  5. If these defects have been found, the walls should be adjusted in the process of packing crates.

a - house - siding obdelat

frame assembly rules crates

Battens can be made of metal or wood.Each of these materials has its positive features and drawbacks:

  1. Metal parts in comparison with the wooden elements are more durable, but also more expensive.
  2. Piles of wood less expensive, but the wood material is defeated, the process of decay and has a high possibility of fire.However, there are certain rules, the implementation of which will greatly reduce the negative qualities of the wood.The humidity level in the bars should not exceed 14%.To extend the service period of the framework and improve its fire safety, it is necessary to process the boards of antiseptic agents.

The installation bases framing occurs in the following sequence of actions:

  1. to frame crates of metal elements can be used to run the ventilation, which in addition to secure the panels as well ventilate the space under the cover.Or the usual profile.To align the crates used U-shaped elements and special brackets.
  2. When mounting the frame space between its elements should be determined on the basis of structural features and the type of panels.Recommended step crates - 30cm-40cm
  3. Reiki should be placed at the top and the bottom, as well as in corners and at joints..Location rods also depends on the method of laying of the material:
  • if the siding is supposed to be mounted vertically, slats should be arranged in a horizontal direction;
  • for horizontal installation it is necessary to adhere to the vertical method location, with vertical installation - horizontal, respectively.
  1. should pay particular attention to the installation process of the frame on a brick wall.Attaching furring elements necessary to carry out such a way as to avoid falling into the dowel joints.

metal carcass

Stage installation insulation material

Getting laying insulation layer, it is necessary to take into account a number of features Workflow:

  1. insulation slabs are laid on the lower portion in the upper direction.
  2. In the process, it is necessary to monitor the quality of the work performed.Plates should be placed firmly and without distortion.When laying several layers of insulation, the joints need to cover or placed perpendicular to each other.
  3. dowels used for fixing on a plastic base.The number of data pieces to be determined at the rate of 6-8 units / m2.
  4. Reliability Direct fixing depends on the ratio of the parameters of dowels and thickness of the insulation layer.Dowel along its length must exceed the material by 5 cm.
  5. first hole in insulation boards are inserted rods that act as temporary fasteners.They can ensure that the correct plate position.
  6. After the bars should be changed to the dowels.Thus all anchors should be placed so that the cap of each element rather tight against the heater.

во-многом-установка-сайдинга-с-утеплителем--дело-творческое-есль

Features laying waterproofing and windproof material

the presence of the waterproofing layer of insulation between service increases significantly.A crate receives additional protection against rotting, if the frame is made of wood, or rust, if a frame made of metal profiles.Windproof membrane necessary to provide a protective barrier from the cold air, thereby improving the thermal insulation of the house.The membrane is laid over the insulation layer, wherein the stacking must be done without gaps.In this case, the removal of condensate from the insulation material will be carried out.

membrane - is not the only option when installing the waterproofing of metal siding with their own hands.For this purpose, and is quite suitable film with appropriate properties.But in this case it is necessary to leave a small space between the panels and the waterproofing layer, as well as between the insulation and the data layer.Features of fixing the waterproofing layer is meant by such factors:

  1. film attached to the frame, depending on the material.It is possible to fix the film timber using conventional staple gun.
  2. double sided tape should be applied to the metal frame.
  3. apply counter slats to create ventilation channels.
  4. In the absence of thermal insulation layer materials for waterproofing and protection from the wind is fixed directly to the wall.
  5. If the wall is made of wood, staple gun is used as a preservative.
  6. When working with a brick or stone wall material is attached by means of plastic dowels.

foliemdmAK2

installation rules dobornyh parts

Additional elements - this angle, the initial and final parts in the form of strips.They are divided into:

  • simple;
  • complex elements.

assembling simple elements produced after the installation work, the complex is set before they begin.Further installation procedure is performed in the following sequence:

  1. need to set the initial elements Before installing siding.These items should be placed at the bottom of the lining so that they are firmly adhered to the cap.
  2. further over the cap at a distance of 4 cm performed using markup level.The upper edge of the strips must match the given mark.
  3. Fix bracket with self-tapping screws.The distance between adjacent bars should be equal to the initial 6 mm.This space is necessary in the event of expansion of the material due to temperature fluctuations.
  4. Last strap is mounted at the junction with the eaves and fixed to the wall.
  5. on external and internal corners need to install complicated angular elements.At the top of the gap should be left for filing overhangs.
  6. the bottom corner piece located below the initial plank 5 mm.These strips are also attached with screws at a distance of 20 to 40 cm

c1

Connecting elements of complex type and seal

Laying seal occurs in the following order:.

  1. upper data elements edge should fit the top of the lastnumber of siding.The bottom edge should be lowered below the initial details on 5mm.Fastening
  2. first performed only at the top.Final fixing can be carried out, making a strictly vertical arrangement of straps.
  3. Mounting is performed by screws, subject to step from 20 cm to 40 cm. Likewise, after installing the panels mounted Simple connecting parts.
  4. dobornyh for fixing parts to the openings used sighting regiment.Installation direction - upwards.
  5. Mounting is performed by self-tapping screws in increments of 30 cm.
  6. At the junction of the elements on the corners of the details should be made cuts in the form of "ears" that after the need to bend down.
  7. To protect the facade from the negative influence of rainfall and infiltration of cold air is applied insulation.This material is placed along the strips.First the temporary fixation using double-sided tape.The final fastening material is effected by exposure of panels stacked on top.

front - Works - 004

Stage siding

Works installation should start from the back of the building and move to the front side:

  1. The first panel stacked on the corners and at the points of junction openings.The elements are fixed to the frame by means of screws.This fixation is performed in the direction from the middle to the edges of the part.Between the screws you need to follow a step in the 30-40 cm.
  2. During the installation of prefabricated parts, near the corner brackets you need to leave a gap of 6 to 10 mm.This clearance is required in the case of expansion of the siding due to changes in temperature characteristics.
  3. When the installation actions under the window and over the piece should be attached to the opening, to measure the parameters of the window casings and add to the result of 6 mm on both sides.
  4. Then siding should be applied to the layout in the vertical direction.
  5. Keeping data mark using a jigsaw you need to saw notches, after 5 mm from the edge you need to attach hooks on the outside of the panel member.
  6. After the panel should start in strips near the window and snap the lower element.
  7. parts located in the final row inserted into the upper bar last fragment.The lower moiety in the penultimate set this element.Then snap the details and thus fixed.
  8. Similarly panels installed near doorways.At discrepancy of the panels with the necessary parameters should be correct, so you can cut.A 6 mm from the edge of the workpiece applied clues that should make a final bar and snap the lower panel parts.

facade

Conclusion

Siding is a facing material, performs a decorative and protective function.This material has several advantages.The process of installation of metal siding under the log does not provide for the complex technological processes, allowing for the job does not need to have special skills and knowledge.

Installation of metal siding.Video: