Drainage around the house

click fraud protection

drain foundation, its characteristics

Drain the foundation , its characteristics

drainage system includes the following types of foundation:

  • Parietal drainage.
  • Drainage via trench.

first type of drainage, parietal, can be designed in when the house has a ground or a basement.Very good drainage mural blaze, when it is the base of development.If your excavation has sprinkled, it will need to dig out and that the extra cost of your labor and time.Therefore it is better to do things right, and follow the instructions.

is also necessary to pay attention to the design of your house, if the house is orthogonal, then drain the system will be run in a circle and its corner side will be to the manholes.It is imperative to choose the most profound place that will be supplied to pumping wastewater beyond your object.To protect your basement you need to put the lock from clay 0.5-1 meter from the walls of your home.

second option drainage trench should be laid down at the 1,5-3 meters away from the base.This option is ideal if your home is worth on clay or loamy soil, as well as when the house has no basement, ground parts or technical room.In the middle of the foundation and the drains lay the clay to protect the design of the foundation by flooding.Remember that the drainage system should always be laid 0.5 meters deep at the base.

You can still see a circular drainage system, which is included in the drainage trench and it fits into the bed overlooking the water, it can be crushed stone material, namely, they filled up our trench.It must be remembered that the connections and the drainage turns are connected by special connecting elements, as well as pipe wrap waterproofing.

In order to properly make the drainage around the house, you need to know that the annular drainage must be performed all around the base of the object trenches.As a result, this will be laid drain system.Alternatively, you can use our ditches for laying livnevki.

Drain the foundation , its characteristics

Construction drains own

to our drainage system has been implemented efficiently and correctly, you need to prepare our foundation in such a way:

  • front part of our foundation is to be processed by special priming.
  • next step smear bitumen mastic.
  • After the first two stages, we should get a thick layer in which to lay the reinforced or painting and masking grid.
  • After 24 hours, when our mastic has to be dry, the coating was applied, it would be removed from the mesh view.

Construction of drains own

Trench drainage and installation

for laying drains under the trench type of soil should be subject to certain types of pipes.To properly install all you need to adhere to these rules:

  • The first thing we need to do - is to prepare the ground for our work.Next, we need to measure the threshold of our height and put pointers.After the measurement, using our pointers we fall asleep sand so, that would make a certain slope of the pipe.
  • After the first point we have to lay a special geotextile our soil to fill the trench with gravel and correctly, that would be observed, our bias.The gravel layer penetration to dig for laying perforated drainage pipes.

Trench drain and its installation

  • pipes need to be laid with a slope of 2 centimeters to check how accurately produced inception, you can pull the entire length of the pipe string or thread tight.
  • all corners of our pipes are provided mounted upright pipe, which is covered by the front side of the hatch.This pipe is needed for the Clean-Out of all the locks.Also, all the pipes are wrapped geotextile material need.
  • To increase the cleaning plane drainage systems need to fill its surface clean gravel layer thickness of 20 centimeters.Next, you need to wrap up the gravel with geotextile, and then that's all you need to fill with sand, which has the largest faction.Such sand is used as a drainage filter which has a bandwidth.

Trench drain and its installation

to quickly manufacture a perforated pipe can be used most simple drainage plastic pipes.This is very easy and simple, it takes the pipe and drilled holes on its base.The main thing is not to do more than the width of the hole filling, to avoid problems in future operation.

Drain well

To install a well, you need to find a place which combines drainage pipes.Most often this takes concrete rings.The soil, which we need for the base is selected from the transition point to the pipe axis.To close the top of the well to choose our cover, resistant textiles.We also need to provide insulation of our water supply that would backfill went well for the release.You can take in the foam operation, which is the fullness of 25 centimeters.