Build Daily

Engineering Systems

August 12, 2017 18:07

When will give heating in Smolensk in 2015

How Smolensk prepares for the heating season 2015?

When in Smolensk will give heating?This issue has already begin to wonder more and more residents of the city.The apartments starts colder and even save heat generators.Preparatory work is now going on in Smolensk, but are in line with the schedule of repairs of heating mains.

In Smolensk, waiting for cold weather

At the present moment the readiness of heating is 90%.Tests of hydraulic heating networks, the length of which about 190,000 meters.In full readiness for the winter boilers Leninsky district, Gnezdova and Red Bora.The heating season is almost ready all boilers of the city, and made a change of insulation of thermal networks.The last line to protect the heat from the fumes.

Replacement of the pipeline pieces in Smolensk

objects of social sphere will receive the first heat, when include heating in Smolensk.Therefore, social institutions were prepared in the first place.The management company should make sure to get the passport ready by 20 September.

specific dates, when should give heating in 2015, yet.However, weather forecasters promise cooling in Smolensk at the end of September.During this period, the city authorities are planning to start the heating season.

In Smolensk, conduct testing of heating systems

From that graph of heat flow depends?

Dates inclusion of heating systems in Smolensk depend on a variety of factors, chief among them:

  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

Smolensk city administration has allocated in 2015 for the repair and maintenance of heating systems more than 400 million rubles.

today to start heating 90% of consumers are prepared.Repair and preventive measures are carried out on time.

supply heating Priority Smolensk

Traditionally, the first heat will have social institutions:

  • school;
  • orphanages;
  • kindergartens;
  • hospital;
  • orphanages.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

room temperature Celsius
optimal permissible
Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.

If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

instagram viewer