Build Daily

Design And Style

August 12, 2017 18:07

How to install the hood

click fraud protection

Tools and materials needed for installation drawing

  1. duct (corrugated or plastic)
  2. Hood
  3. Building level and measuring tape
  4. Hammer and screwdriver
  5. dowels, screws and nails
  6. socket-outlet
  7. Pencil markings
  8. Hacksaw

Highlights prepare to install

  1. device must be checked for suitability for the installation, as after installation to repair the fault will be almost impossible.Furniture and walls are drilled according to the specific size and when removing may be damaged.
  2. place under the device is required died out and mark its height.It is understood that the recessed hood placed during installation cuisine and standard flat and attachments - after a complete kitchen units.
  3. distance from the hood up to the plate is usually regulated and prescribed in the instructions for the product.However, there are some general rules and the distance should be:. On the gas stove - more than 80 cm and over electric - more than 70 cm Of course, if the distance between the cooker hood and efficiency of the device decreases at times, but below the mount, you should not izfor possible violations of work.

Distance from the gas stove to the hood

  1. is imperative that the location was near the exhaust outlet.Best of all, if it is earthed and is only applicable to a single device, as due to network overload and short circuits the unit may break down.It is advisable to use a protective blocker on the mains, which will turn off the device when exceeding the permissible loads.

installs integrated hood in cabinet.Step 1: preparation of the box antivozvratnogo mechanism

Production boxes made of aluminum and galvanized metal by the scheme, which is located below.

Driving antivozvratnogo box

The picture you see a box in which there are two holes.When the valve is opened (it is marked in red), all the smells are eroding through the window, that is naturally ventilated.If the valve closes the window, the ventilation is carried out within the hood.Reverse air flow is not possible, and adjust the valve can be due to a small fine spring made of plastic or aluminum.

This valve can also be bought at the store.It is set to the opening of the ventilation shaft.

Step 2: installation of wall cabinet

better housing boxes set into the cabinet, which was later carefully fasten the mounting foam.However, the installation drawing directly in the cabinet should be made so:

  1. markup Performing cabinet and the holes in it.
  2. cabinet Dismantle and cut holes in the wall using a jigsaw.First you need to make holes in the markup, and then - to cut the desired hole in the closet.

Installing the cabinet hoods

  1. Performing duct holes in the shelves of the cabinet.At the top of the wall to make a hole flapper 5 mm.

Step 3: Installation duct

In previously completed holes, place the corrugation in order to give it a square shape.Next cut the part of the pipe, which remained on the bend and adjust the angle.Then you need to hang a cabinet with corrugations on the wall and apply sealant to the duct joints that he was more stable.

Openings for exhaust duct

Step 4: Fasten the box, drawing and corrugations

important to secure the box to the cabinet so that it connects the ventilation path with corrugations.To do this, use silicone or may mounting foam for large gaps.

to secure the device in the cabinet should be used screws and to fix the cabinet on the wall of the need not only screws, and dowels.

Secure hood and corrugation may be due to the clamp and sealant, which is sized parts.

Next, connect the ventilation shaft duct and dock protective grille with ventilation opening, as shown in the following picture.

Connection to the ventilation bellows
Accessories for drawing

Important!It is necessary to reduce the amount of bending corrugations, as each of them also reduces the power extraction traction by 10 percent.

mounting standard product without cabinet

avoid damage furniture board from the heat, steam, and moisture often simply abandon the cabinet and set the hood to the frame and the wall plug.Rama performed with the letter "P" and advocates support for the device.

When installing a hood above the gas stove uses stronger fasteners (long screws) which are threaded and a nut.Screwing them in the same way as in the case of plugs, however, it is important to make mounting device with a small space from a wall.

Plumbing long screws

Step 1: wall layout for drawing

raschertit horizontal surface of the wall above the stove will help you building level and measuring tape, a marker or pencil.Consider the features of each type of plate and mark the allowable distance at which the instrument could be.Put down points for securing the future of the device.

The markup for drawing

Step 2:

drilling holes Take a drill with different types of drills to make a hole.The drill bit is chosen according to the wall thickness and the material from which they are made.The resulting holes, place dowel.

Step 3: Mount Hood awnings and canopies

Binding Perform screwdriver, then they hang the hood.Then you can connect the device to the mains.It is essential to an outlet to attach the fuse and do the vanishing of the network in order to avoid extremes.To fix the result put a decorative box.

Hood , bolted on canopies

Installation domed hood Dome hood

by type fastening and can be screwed to the wall and to the ceiling.Installation is made in several steps.

Step 1: The marking of the walls

During the markup should be much more careful than to install a flat hood.The first thing to do is to draw a horizontal line above the stove, using a builder's level and a pencil.Also it should be noted the height of the entire device along with the size of the pipe.When installing the hood must not cross the lowest permissible point.

then necessary to put a vertical line symmetric mounting drawing.Measure the distance from the bottom of the device to the following two points of attachment and subject to the centerline of the horizontal swipe up.

Partitioning wall for exhaust mounting

Step 2: drilling openings

After marking recheck it on the line.Also make sure that all screws and dowels are selected according to the wall material.Then proceed with the drilling.In each place the resulting hole plug, and screw the screw into it.For accurate fixing of the device experts recommend that in the first place to fix the upper part of the device and, after their alignment - and bottom lock device.
Dome hood for the kitchen

Step 3: Connect the ventilation

Vent pipe can be plastic or corrugated.From the number of bends in it the quality of air suction hood depends.Take care of the check valve, which will also resist the ingress of air from the street, and carbon monoxide from the air paths.

How should attach different types of devices, look at the video.

Good luck to you repair!

instagram viewer