Laying blind area around the house to protect the structure from direct exposure to rain.Framing eliminates the accumulation of moisture in the upper layers of the soil, prevents the destruction of the cap, the foundation and basement.It fits blind area around the house with his hands in several stages.It may be made of a conventional paving tiles.

Content

  1. Driving blind area of ​​paving slabs
  2. Step by step instructions for creating a blind area around the house
  3. Nuances
  4. Video building blind area around the house with his own hands

Driving blind area of ​​paving slabs

Step by step instructions for creating a blind area around the house

to begin the preparatory work should be after the completion of construction of the house, the end of the facade work.This will further eliminate the violation of the attractiveness of the tiles to be laid because of falling at her building materials, paint, plaster.

markup is beginning.Then removed a layer of soil around the house.

next stage is filled with concrete chips, there is its compaction.

Next are installing curbs using cement mortar.In this case also set borders that separate the blind area of ​​the cap.

prepared area under the terrace.There compacted layer is directly adjacent to the cap.However, the expansion joint is left to about 2 cm, which will prevent soil pressure on the foundation in the winter when the soil shifts occur.Typically, this seam is made of several layers of roofing material or bitumen or Penoplex.

addition to the gap between the blind area and the walls need to pre-lay frame for the steps and paths leading from the porch to the street.

Then again zasyvaetsya concrete curbs and chips mezhdk compacted.

top of the layer of concrete aggregate is laid and leveled small fraction rubble.

then carried out laying paving slabs around the house and on the path leading to the porch.

It is placed paving slabs at the site of the house.

gap between the house and the blind area is filled with small round stones.

The joints of paving slabs poured peskotsementnaya mixture.all blind area watered notches.

The reduced step by step guide will help you understand the main stages of the construction of the blind area.In addition, the Executive recommended to study tips, videos and photos, describe in detail the process of laying the frame.

Nuances

Correct device blind area around the home requires a small bevel on the walls.This arrangement will allow the frame immediately after precipitation take them away, avoiding stagnation of water near the cap.Other features of the construction of the blind area, which allows to simplify work and avoid errors, include the following:

  • necessarily need preform drawing, marking the creation, on which the installation will be carried out;
  • requires accurate calculation of the required volume of paving slab according to the size and structure of harvested frame;
  • use krupnofraktsionnogo rubble is unacceptable: it can lead to a shift of tiles, it will complicate the installation.