Gas connection to a private home

process gas connection to a private home is quite difficult, but very necessary.Although all treatments require patience from the owner of the house and material costs, as a result, he gets a high-quality energy source for small money.In connection with the developments in the legislative sphere, before starting to work on this issue, you should carefully read the instructions for gas connection to a private house and to the legislative acts that regulate this process.

Content

  • Gas connection to home: features and stages
  • Gas connection to a private home - the requirements and documentation
  • features and the price of gas connection to the house
  • gas supply rules to
  • homegas boiler room equipment in the private house

gas connection to home: features and stages

Before embarking on the purchase of land or a private home, be sure to explore all the communication systems that run on it.If the house is located in a convenient location, it does not mean that it is brought to the gas.In the absence of payment for electricity gas and other utilities are significantly increased.

10

The variant of the presence of gas networks, but is not connected to it.In this case, you want to carefully review the legislative framework allowing to carry out the gas connection to a private home, in accordance with legal regulations.

distribution pipelines must belong to a particular company, such as a village council, Gorgaz or private businesses that provide the delivery of gas to the town.From the pipeline amount depends on the owner, you want to pay for the connection of gas and its use.

There are several gas pipeline control zones:

  1. site locations range from the distribution pipeline affects the cost of gas.
  2. If necessary, additional laying of distribution pipelines require additional cash investments.
  3. With the passage of gas distribution pipeline for transit stations, you must sign a paper to coordinate the resolution sites owners to pass on them the pipeline.

During the heat load calculation and design of the gas connection must first determine the thermal load of the room.This value depends on such factors:

  • area of ​​the house;
  • presence of insulation;
  • number of windows and doors;
  • ceiling height.

I

With the help of experts to carry out the calculations will be done easily.For example, if the space heating is planned with a ceiling height of 250 cm and a total area of ​​20 square meters, then it will need to have the heating capacity of the heating equipment 2 kW.

Tip: to correctly calculate the heat load will not have problems with gas supply and the installation of the boiler equipment.Since these data are necessary not only when signing the legislation, but also when selecting the boiler.

Gas connection to a private home - the requirements and documentation

first phase of work involves the choice between the owners of independent preparation of all documents and specialized companies that are engaged in this issue.

The cost of services for the preparation of documents included the complexity of the design of gas, so the price ranges from $ 1,000 to 3,000.

To get the technical conditions of the project, on issues related to gasification, should apply to the service dealing with citizens' services and implementer of a gas in the village, which is located in a private house.To access requires:

  • statements, which provide an opportunity to obtain technical conditions data;
  • copy of the passport owner of the house;
  • documentation proving ownership.

In that case, if you plan to connect the gas to advance construction of the building, it requires the presence of an act of acceptance house in operation or technical passport of the building.

8

When connecting gas to the site on which the house is not built yet, you must provide a contract confirming the ownership of the land.

Note that the gas connection to the house will be possible only when the site will be included in the general scheme of gasification and gas used by consumers will come without fail to all areas.Collect this documentation takes 20 to 30 business days.One of the important conditions for the gas equipment is the distance between the gas line and plot.The maximum length is 210 m and the maximum gas consumption - 5 cubes per hour.

So, to get technical conditions required to apply to the local management of gas service.The specifications indicated gas service requirements, under which the gasification is carried out.To receive calls, you need to provide a copy of passport and identification code, technical data sheet housing and a statement in which you need to specify the heated area, average gas costs, installation location and technical features of the equipment.Keep in mind that the development of technical specifications is a paid procedure, which costs $ 30.

When deciding treatment in the project organization should be careful to approach her choice.After all, the quality of work and level of competence of experts depends on the accuracy and durability of the gas connection.When contacting the company of this kind, be sure to ask for a license and a certificate confirming their ability to address your questions.

7

To contact this company requires:

  • technical conditions;
  • surveying the site, which caused the utilities, pre-certified by the local gas supplier is required to hire a special employee, organization or design institute for the production plan;
  • copies of the technical passport of the house or other documents related to the building permit home, as an alternative instrument used construction project;
  • if installed heated equipment from abroad, it requires the presence of certificates of conformity to all the technical requirements, except that you must provide proof of its tested for use in your country.

features and the price of gas connection to

home in relation to the new rules, gas service, after presenting them with all the necessary documentation required to independently carry out the gas connection to a private home.Representatives of the gas service should bring a gas pipe that runs from the utility line to the plot on which the house is located.This connection procedure is home to the gas is from 1000 to $ 1500.The cost of this work depends on the complexity of the connection and the length of the pipe.

After this procedure is required to match the project to provide gas supply to the private home.This process is the most expensive, as it requires gorgaza services or private companies that are authorized to conduct such activities.

6

If we consider the conduct of the process in practice, it is preferable to choose the second option - a special company, as in the public service, this procedure will be carried out from 6 to 9 months.Seen from a material point of view, of course, cheaper to apply to the public service.Therefore, the choice is up to the owner, who has to decide for themselves what is more important for him: time or money.

for drafting project documentation requires:

  • list of all devices that will connect to the gas and their technical characteristics;
  • installing devices and their location directly in the building premises, in relation to the previously established safety and chimneys.

After submission of documentation is determined by the person who called the contractor - he is responsible for the timely execution of all work and summing up the gas to the house.

When the project is ready, comes the turn of work on the installation and construction of highways.In most cases, if you use services of a private company, it is engaged in carrying out this type of work.Therefore, choosing a contractor, should be based on their versatility and the possibility of the two tasks - drafting documentation and direct connection.Especially since the implementation of an integrated order companies offer good discounts.

For building gasification requires checking his special services of gorgaza.This will require two to three weeks.Subject to all terms and conditions and the successful completion of the test, a representative writes document - a receipt that shows the building of gasification.

5

Then all the technical documents and a receipt is sent to the service gorgaza.Within three weeks, employees must seal the counter and put gas.

For fixed by the contractor works on actual connection Summing distribution pipes directly into the house building.But, at the entrance of the building is a shut-off valve, which can not be opened without one of the representatives of the city gas service.

When the connection is completed, the study is performed according to the rules of safety instructions and the use of gas.After that, the gas is supplied and carried out monitoring of the system performance.

Tip: It is recommended to test the system to order a paid service that will help to check for leaks in the gas main pipes.To prevent gas leakage and protect yourself and your home, it is better not to save money on this service.

If we consider the total cost of all the work without the price of the gas boiler and other heating equipment, it is from 1000 to $ 5000, and the terms of this procedure ranges from six to nine months.Although this procedure is quite complicated and requires a large initial investment, within three to five years, it is completely paid for itself.

4

Rules

to house the gas supply offer to consider the basic rules that should be followed to connect the gas to a private home:

  1. Filing Gorgaz.Wait for about one month for the preparation of technical specifications for connecting homes to the gas.
  2. choice of the most suitable model and capacity of the boiler, through which will be home Ardagh and hot water supply.The main requirement to the equipment: reliability, safety, lack of cost overruns, cost of operation.
  3. Room preparation for the installation of the boiler.The boiler must be installed in a room that is prepared in advance, according to special regulations and fire safety requirements.
  4. Act Preparation of certificate of compliance of existing chimneys and vents all requirements.
  5. design documentation defining the architectural properties of the house and on the requirements of SNIP.This project is coordinated by special bodies.
  6. Carrying gas to a private home, preparation of documents for the state commission.
  7. signing of agreements with the company performing the work puskonakladochnogo nature and conducting regular maintenance of technical control equipment.
  8. Contacting local authorities to give permission for the gas supply to a private home.

3

gas boiler equipment in a private house

The main components of the gas boiler acts:

  • boiler;
  • circulation pump;
  • gas burner and the line;
  • system that provides safe operation;
  • system to the presence of devices for monitoring and measuring the performance and operation;
  • system that provides automatic control.

Depending on the boiler's location in a private home, they are divided into:

  • freestanding - arranged at a distance from the entire house, this boiler is less convenient because the winter is required to leave the house to check the operation of the equipment,except that it differs following advantages: does not create noise and odors from the combustion of gas, more secure, it does not take up usable space in the house;
  • Attached boilers are more economical in their construction, rather than freestanding, as it is from the walls of such boiler necessarily adjacent to the building, this boiler makes it easy to enter it from the house, so does not cause discomfort during the winter, it does not require the constructionspecial equipment and laying of heating;
  • built - these types of boilers equipped with directly in the room apartments or private homes, one of the advantages of these types of boiler is the lack of need for additional laying of a heating.

2

offer familiar with the general requirements that apply to any type of boiler to install a gas boiler:

  • prohibited positioning in the boiler room for more than two boilers or other appliances heating purposes;
  • forbidden to place materials in the boiler room with high flammability;
  • floor in the boiler room must be concrete, the variant of its decoration using tile;
  • wall decoration also requires special attention, as the materials should be non-combustible, such as tile, metal, concrete or brick;
  • boiler should be positioned in the center of the room, in order to facilitate its maintenance, as appropriate;
  • the inside of the entry door to the boiler room is sheathed with metal or other type of non-combustible material;
  • recommended to use only certified equipment with all the necessary licenses, installation of improvised boilers inadmissible;

1

  • possible installation option in a detached house, on the ground or visit the kitchen;
  • room for the installation of the boiler must have natural ventilation, daylight and sufficient space.