Frame bath with his hands.Step by step instructions ( + Finished Projects )

click fraud protection

Article Contents:

  • 1 Projects framed baths
  • 2 Instructions construction framing baths with their hands
    • 2.1 project baths
    • 2.2 Construction foundation
    • 2.3 How to arrangefloor bath
    • 2.4 frame Mounting
    • 2.5 Building roof
    • 2.6 sheathe the walls of the bath
    • 2.7 interior decoration
    • 2.8 Construction veranda
    • 2.9 Installation furnace


small room size 3 × 4 m in the form of towers accommodates locker room, steam room and washing.The design provides a small terrace, which has a total carcass house with a gable roof.Finishing bath made wood siding, which is combined with the lining of the foundation under the marble stone.Soft roof and plastic windows make the design practical and reliable.
1-1 1-2

Project 3x4 framing baths with their own hands.Photo Frame

Bath size 4 × 4 m made of wooden beams and planks of 35 mm thickness.The structure has a usable area of ​​13.14 square meters.m, which are located 4.08 m bath, washing and dressing room 2.4 sq.m area of ​​6.66 sq.m.Bitumen roofing shingles is combined with a wooden wall and a fence terrace and marble finish foundation greatly improves the aesthetics of the building.


2-1 8dzffed1d720kadafe669eaz6fd64f01

Project 4x4 framing baths with their own hands.Photo Frame

bath of laminated veneer lumber has a useful area of ​​16.81 sq.m.Of these, 2.83 sq.m.are allocated to the shower, and 4.8 m - a steam room.All the remaining space is occupied by a dressing room, where you can set a comfortable table and benches for get-togethers in good company.Wood trim elements painted in contrasting colors, combined with a soft roof and foundation, performed "under a rock", making the construction of elegant and presentable.
40444bf49383a5dyadvf12shf28e28fd64 f480d62147065b2999k558d3s26k7e26

Project 5x4 framing baths with their own hands.Photo

Inside bath size of 5 × 5 m can comfortably accommodate several people.The project involves not only a shower, steam room and a vestibule with the function of the locker room, but the rest room area of ​​8.5 sq.m.Bath house looks original thanks to a canopy over the veranda, which follows the shape of the roof.Decorating the walls provides a contrasting combination and made to match with soft roof, which significantly improves the visual impression of the frame construction.
bf000391476b819973887f6vsed78e45 66bezakcha84610147ae550fe631b007

Project 5x5 framing baths with their own hands.Photo

Big Skeleton Bath with dimensions 6 × 5 m built on a standard layout with a shower, a steam room, vestibule and a relaxation room.the latter area is 11.9 square meters, so after the water treatment will be somewhere to unwind and relax.At the entrance to the bath is provided with a separate small porch gable canopy, made in a single style with a roof construction.
s53a1ade828474fvchaes497ts727134ke s665b79s6670127e73f416890ea87she5

Project 6x5 framing baths with their own hands.Photo

frame house-size bath 6 × 6 m can easily replace a country house.The internal layout provides not only a bath, shower and a separate room, but also a small bathroom.The total area is 32.4 square meters.m, of which 15.4 sq.m is given under the living room.Decorating the house is made in the Scandinavian style, with a roof of metal and cap, faced with wood paneling.
a1da6d585za336d9265d08606a5f857f 81ё35f5e6f373db8s206f838044ch35v9

Project 6x6 framing baths with their own hands.Photo

House room size 6x6 meters executed in traditional Russian style with porch and gable roof with shingles.The interior space is divided into a large room, as well as a steam room, shower room and WC.In front of the living room area of ​​15.4 sq.m is equipped a small vestibule, where you can remove the top clothing and shoes.To finish the house used wood siding, painted in soothing pastel tones.
7794d7f3a5fvd55aef4163b3b53d2daa 73ts501tsd2ds27ts358eab5ee0e254ebbf 7345b54kb2e5e50b38af70fe9abe11dts

Project 6x6 framing monsardoy baths with their own hands.Photo

Instructions construction framing baths with their hands

One of the best ways to relax and unwind is to visit the baths.Construction of a real Russian sauna room of the log - troublesome and costly, so many owners of suburban areas look in the direction of frame construction.Online you can find many projects framed baths available for the construction of their own hands.Below we explain how to fulfill their dream in the form of a wooden house with a steam room, shower room, lounge and terrace tracery.Help in the work will have detailed instructions, diagrams and photographs of the real draft framework baths.

baths project

Despite the rise in the cost of building materials, is currently the method of frame construction can be expensive to build a bath size of 4 × 4 m, and attach it to the porch width 1.8 meters.Dimensions of the bath house allows to divide the internal space into the steam room the size of 2.1 × 1.6 m, shower 1.6 to 1.6 m and room for gatherings with friends size of 3.8 × 2.1 m. In today's building materials prices can be free to meet the sum of 350 000 rubles, if the skeleton bathIt will be built with their own hands.

1

Frame bath with his hands step by step instructions.Photo

Construction foundation

The project involves the construction of a bath framing strip foundation with shallow bookmark.In our case, required trench depth up to 60 cm in it. If the depth of soil freezing on the site of a significant value, the pit must be deeper.In any case it is better to consult with the drawings framing baths or consult with professional designers.

2

Before you begin any excavation, remove the plot allocated for construction, and make markup .To do this, at the corners of buildings, as well as in places of installation of walls hammered pegs and pull a cord.To check the geometry of the future building, is sufficient to measure the respective diagonally - they must be equal.After that proceed to install the formwork.To do this, collect the wooden planks under the framework of the fill, set the lateral spacer strips and bars on the mounting location of the wooden floor the lag.

3

formwork installation can be carried out both before digging, and after it.In the first case it will be easier to dig.The second trench is more accurate, and the amount seized soil less.Note that the floor is to be installed with an air gap, so the ground is not warehoused in a circumscribed space, and take out of the border area.

5

Formwork set for interior and exterior walls, as well as a furnace bath.To increase the strength, inside a wooden frame can be placed Laying nets.Trenches covered with sand, seal and throw it with water, and then filled with concrete to a height of fixed formwork.

6
Frame bath with his hands step by step instructions.Photo
7 8 to the foundation for framing baths, built with his own hands, was strong, it is recommended periodically moisturize it.This requirement is obligatory to perform if the work is carried out at high ambient temperatures.After the concrete is completely set (angles facilities must acquire sufficient strength) wooden frame disassembled.By the way, in order to facilitate this work, it is better not to connect the board with nails and screws.

I

How to arrange a half baths

bars forming the slots for the lag, gently removed from the basement.After that, between the walls of the base are placed roofing felt or other suitable waterproofing material.

10 eleven

On concrete base laid lags , which strengthen the props to eliminate deflection floor boards during operation.The upper surface of the foundation tape and covered with waterproofing .

12 13 14 15

floor in the bath frame plank planks that are laid on the joists, moving from one of the foundation walls.To avoid premature deterioration of wood, the entire timber is treated with antiseptic compositions .

16

frame Mounting

One of the most important stages of the construction of a frame assembly.Billets walls and internal partitions framing baths are separate wall hips, which are collected on a flat, prepared place.Construction of the trim mounted boards or beams, leaving openings for window and door in accordance with the project framework baths.

17

Frame bath with his hands step by step instructions.Photo

18 19

After making wall blocks their set on the foundation, at the same time bonding with screws.It is very important to observe the level of all the designs and angles of the building.By the arrangement of the roof design of the volume of timber begin only after all its components will be checked according to the geometry indicated by the figures framing the bath.

20 21 22 23 24

Building roof

The next step is to proceed to the arrangement of the roof framing baths.

25 26 27

Installation of the roof beams are beginning to unfold in full compliance with the ceiling framing drawings baths.After that, the beam clapboard and roof mounted skeleton of trusses, braces and struts.As will be through the roof chimney, be sure to leave a gap for the installation.

28 29

After that a vapor barrier is laid, fastened kontrobreshetki boards and battens.Next, mount the roof.thirty

31

Frame bath with his hands step by step instructions.Photo

Gable roof has many advantages, from the simplicity and reliability of construction and ending the presence of a small attic space for storage of accessories and bath accessories.32

sheathe the walls of the bath

gaps between the vertical and horizontal frame members fill any insulator. This can be a rolled material, and mats.Recent convenient because of their correct geometrical shape simplifies the installation of insulation in wall openings of the framework.The heat insulator in rolls require a peal and cut out to the size fills the voids between the boards.

33 34 35

After the last opening will be filled with mineral wool or other material, ready to install vapor barrier and waterproofing membrane .It will cut off the penetration of moisture into the insulation and provide effective insulation bath.Only after the wall framing in the bath will be covered by damp-proofing, start to finish outside surfaces blockhouse.

36 37

In order to save material first sheathe the overall surface, and then trim the seats near the door and window opening.

38 39 40

Using screws, foam gun and its application install window and door.In the process, be sure to monitor the verticality of the assembly during the initial mounting screws and re - before blowing foam into the gap between the jambs and the house frame.

interior decoration

Another layer of insulation is installed in the inside of the house frame.Heat-mounted vapor barrier , joints of panels which necessarily glued special tape.

41

Frame bath with his hands step by step instructions.Photo

42

Interior decoration framing is done with wooden paneling bath or blockhouse, who with his hands fastened to the uprights after the installation of heat and vapor barrier.Similarly finish exterior surfaces, first sheathe solid wall and then proceed to the areas around windows and doors.Since this in turn will go and cut the desired length, the part facing the timber will be able to save.

43 44

When finishing department for doubles instead of the vapor barrier layer is set thermally material in the form of foil or polyethylene foil.Last set metalized layer inside the premises.Thus, the wall of the pair is a "sandwich" of the mineral insulation, Heat Reflector and wood lining as a cladding material.

45 46 47 48 49 50 51 52

Room for receiving a soul, equipped with shower enclosure and shower elements programs.At the same time all the walls, which will hit the water splashing, sheathe water-resistant plasterboard and trim tiles and decorative panels from thermoplastic.

Construction veranda

Verandah, Attached bath, improves aesthetic perception of structures and provides additional space for outdoor recreation.For its construction using a shallow foundation columnar or rostverkovogo type.For him everything in the right places are drilled hole depth of about 20 cm, reinforce them and line the bottom and sides with roofing material or polyethylene.After that, install the formwork and pour concrete structures.Boards to support the foundation set "on edge."This eliminates their deflection under load.

53 54

Install vertical supports, which are tied off at the top of the cross beams or boards.This design should have increased strength, as it will have a basis weight of the roof extension.Vertical uprights attached to the substrate using anchors.

55 56

to the cross beam is attached bath ceiling rafters, which relies on the other edge of the upper frame crossmember.On top of securing the batten board, and then the entire structure are covered with roofing material .The roof is made of slate, Ondulina or other roofing material.

57 58 59

Paul lay on the porch boards, and the side and front wall of the terrace paneling in the form of grids of intersecting strips, decorative plates of interwoven strips of plywood and TD entrance to the veranda equip wooden dais, downed from the boards andboards.As you work, all the wooden elements are treated with protective decorative coatings.

60 61 62 63 64 65 66 67 68 69

Installation furnace

final stage of construction of the carcass baths with their own hands is the installation of the stove and chimney.At this stage, be sure to comply with all fire safety measures, so the work is carried out in full compliance with the rules and regulations of installation of heating equipment in wooden structures.

70 71

Frame bath with his hands step by step instructions.Photo

Choosing an oven, it is necessary to bear in mind that the design, which can be equipped with a heat exchanger, allows you to install a water tank in another room.In our project, the carcass is provided bath furnace installation model Ermak-12 with 70-liter tank.The place of installation of the tank wall between the pair selected department and shower area.

72 73 74 75

At the same partition is installed and a 120-liter barrel of cold water, which is filled from a well with a pump.Automate the process of container can be set by setting the float in the tank, including the pump when the water level drops below the permissible value.

Installation

drainage system drainage system installation begin at the earliest stages of construction.To do this, even during the arrangement of the foundation set horizontal wiring sewage from all points of the catchment area, which is connected to the drain sewer pipe.The individual tube wiring perform pipe diameter of 50 mm, and the bulk - 100 mm sewer pipes.