Build Daily

Engineering Systems

August 12, 2017 18:07

When will give heating in Belgorod in 2015

click fraud protection

As Belgorod prepares for the heating season 2015?

Preparing for the heating season began long before the onset of autumn.The city administration has given an order to all business units to conduct not only tested, but the heating system and repair the city.Breakage detection have been put on the conveyor, and were eliminated in the alternate order.Throughout the spring and summer were carried out repairs of steam boiler and replacement of heating mains.

Turning heating

Particular attention was paid to the city water supply and power supply.all defects have been eliminated from the municipal services last year that in 2015 the city of boiler was started exactly on time.

From that graph of heat flow depends?

Dates inclusion of heating systems in Belgorod depend on a variety of factors, chief among them:

  • weather conditions in the city;
  • availability of funds for the timely launch of the heating;
  • deadlines repair and maintenance work with the system.

today to start heating 100% of consumers are prepared.Repair and preventive measures are carried out on time.The date varies in the time interval - 3-6 October.All changes are subject to weather conditions in the city.

Starting the boiler

supply heating Priority Belgorod

Traditionally, the first heat will have social institutions which are of paramount importance for the life of Belgorod:

  • kindergartens and schools;
  • hospitals and maternity hospitals;
  • social security institutions of citizens;
  • administrative authorities.

Once they will be provided with heat, the heating system will start in residential buildings.The last will be connected to heat industrial premises.

optimum temperature in the living room

If you have doubts about the quality of service housing heating systems, make temperature measurements in the flat areas.Optimal for SanPin 2.1.2.1002-00 should be such indicators:

Room Celsius temperature

optimal

permissible

Spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

Whatdo if the heating was not given

Find out with whom you have signed a contract for the supply of heat.This may be as a management company and teplokommunenergo directly.There could be required to recalculate for the improper provision of services.

By law, heating can be turned off in a month for 24 hours (total for all days).At the same time continuously heat can not be more than 16 hours (if in a residential area and 12 above), no more than 8 hours (if the house is 10-12 degrees Celsius) (if 8-10 degrees temperature) and no more than 4 hours.
If these general rules are not met, for each hour of service refusal (total amount for the whole period), payment for heating will decrease by 0.15%.

Poor quality service teplokommunenergo

instagram viewer