Bath foam blocks of their own hands .Step by step instructions with photos

click fraud protection

Article Contents:

  • 1 Step by step instructions of building a bath of foam blocks with their hands
  • 2 -step construction of the main structural elements of a bath of foam blocks with their hands
  • 3 bath of their own hands silicate blocks
    • 3.1 Benefits gazosilikata
    • 3.2 Step by Step construction of a bath of silicate blocks
    • 3.3 procedure for laying insulation
  • 4 bath project from foam blocks

1

Step by step instructions of building a bathfrom foam blocks with their hands

Substrate Preparation

recommended to make project future construction Before the construction of a bath of foam blocks.For this, based on the features of the site, are made all necessary calculations and drawings.Weight of the finished structure, regardless of its size, will be small.That is why for such facilities will be sufficient small thickness of the cap.For the construction of a bath of foam blocks fit normal strip foundation, for a device which will need to do the following:

  • perform markings on the ground with the help of pegs, roulette, building strands and geodetic instruments;
  • dig a pit .In this case, a trench;
  • set formwork ;
  • put rebar or reinforcing mesh;
  • cook concrete mixture and pour it into the previously installed shuttering;
  • after curing of concrete, the formwork is removed.

2

After the ribbon foundation attains strength, it will be possible to start pouring the concrete foundation under the stove .At this stage, as it will be necessary to carry out engineering services.They will be needed for the organization of the water drain.

3

concrete base under the furnace should exceed the size of the bottom of the furnace.To do this, you must make the appropriate measurements, and then install the formwork and pour concrete.Also at this stage, a cushion apparatus across the floor area.For this purpose, suitable small gravel fraction.

4

At the final stage of the construction of a bath of foam produced device horizontal waterproofing.For these purposes, you can use the roofing material.waterproofing layer is placed between the base and the first row of masonry from the foam blocks.

-step construction of the main structural elements of a bath of foam blocks with their hands

masonry exterior and interior walls of foam blocks.

5 6 7

bath of foam blocks with their hands.Step by step photos

8 I 10 eleven

construction of a bath of foam blocks.Photo report

12 13 14

Laying floor of foam blocks.

15 16

Manufacturing wooden floors.For this purpose, suitable timber.

17

device battens and rafters .

18 19 20 21

device coating roof. In this case, the color steel sheet to be used.Also at this stage the construction is necessary not to forget about the installation of the ridge.

22

After coating the roof, you can start the device visor .To cover it, you can use any roofing material.To construct was stable, it will be necessary to install two metal pipes.The visor on one side is fixed to the outer wall of the bath, and on the other - on the metal poles.

23

how to make a bath of foam blocks with their hands.Photo

24

Then you can begin to trim pediments .For these purposes, you can use the bunk.On the one hand we have provided additional pediment door, and on the other - do two vents and set them ventreshetki.

25 26 27

Arrangement of outdoor lighting .

Setting input doors and, if provided by the project, windows.

28 29

device porch. To do this you need to install the formwork and pour concrete space given.After the concrete attains strength, the formwork can be removed.After that, to make the porch complete the form will need to be oblitsevat its tiles for exterior use.

Interior decorating

At this stage, the work of building a bath of foam blocks necessary to provide a vapor barrier design.After that, you can begin the installation of lining.

thirty 31

bath of foam blocks with their hands.Step by step photos

32

In order to avoid heat loss, it is necessary to make insulation attic with mineral wool.Lay it must be between the beams.

33 34

In prepared in advance the place you are installing the stove, which is necessary to bring the chimney.

35 36 37 38

Chimney should be withdrawn beyond the roof for a certain distance.To him did not get the garbage and precipitation, it is necessary to close the top cover.

39 40 41 42 43 44 45 46

Installation of door frames.

47

laying tiles on the floor.

48 49

From the steam around the construction of the furnace must be installed lattice made of metal.They then laying the stones will be made.In the lower part of the wall is necessary to make two ventilation holes with a diameter of about ten centimeters.

51

52 53

construction of a bath of foam blocks.Photo report

54 55 56 57 58

For facing steam room, we used natural wood.Also at this stage, wooden chairs and headrests were made.

install a water tank in the washing room.

59 60 61 62 63 64 65

bath of foam blocks with their hands.Video instruction

bath of silicate blocks with their hands

At its plot, you can build a bath of silicate blocks.Next will be considered the construction of facilities size 5h5,3 m. The height of the ceiling in this draft is 2.25 m. Gazosilikata was used for masonry walls and attic fronts.tile - wall paneling for wash bay has been used for interior decoration for the holiday and the attic.

Bath - of - silicate blocks , gables

Benefits gazosilikata

gazosilikata has the following advantages:

  • erection speed.This is due to the large size of the building material;
  • high thermal insulation properties;
  • a high level of fire safety, as gas silicate is non-combustible material;
  • this material does not rot;
  • relatively low cost of this building material.

Step by Step construction of a bath of silicate blocks

device strip foundation with two layers of waterproofing of roofing material.

Ribbon -base- for - bath

bath of silicate blocks with their hands.Photo report

for masonry blocks suitable size 20h30h60 see. They have to be laid on edge.The wall thickness in the end turn out to be 20 cm. The use of cement-sand mortar in the proportion of one to three for stacking blocks.The process of masonry as follows: lay the first blocks should start with the corners.On the layer of roofing material, which was used as a foundation waterproofing, apply a layer of five millimeters thick solution.Do this by building trowel.

Subsequent rows must be placed with a shift of 15 cm. This will be carried out ligation sutures.In the process of the construction is also necessary to determine the place of location of the window and door openings.Thus masonry walls is done as long as the height of the building will not reach the level of 2.25 m.

first -series - silicate - walls

After that you can start the device attic gables.The height to the roof ridge must be 1,9 m.

laying insulation in the steam room of the heat-insulating material, insulation and finishing materials.

interior decoration.For these purposes edged board thickness of 20 mm was used, and 125 mm in width.

ready - wall

procedure for laying insulation

The first step is to fill in the rack wall.In this case, for this purpose have been chosen rack section 5x5 cm. The vertical slats fastened with screws.

Next, put insulating material .For these purposes may be used mineral wool «Paroc» 50 mm thick.

insulation , wall - steam

Top thermal insulation is necessary to lay a layer of vapor barrier material.foil and film "Metaspan": two types of building materials are provided in the project.Before you put the material must arrive at the rack film.Each piece must be placed on the other in the "overlap".Suffice it to 15-20 cm. On top of the film is necessary to lay the foil.It is also laid with overlapping.Places need to glue joints materials folgezirovannym tape.

vapor control layer

Next, you need to build a crate , which will be made installation of lining.

crate - for - lining bar - between - and vapor barrier - crate

device lining of the lining of the timber.The nails can be used as a fastening material.

lining - of - aspen - to - finish - inside - steam

for surface protection against rot, can be coated with a special oil battens, which will give the wood a matte effect.

In the washing room for the walls can be used tile .durable tile thickness of 8 mm was used for this project.Placement was made to frost and moisture-resistant tile adhesive.The thickness of the adhesive layer was approximately 10 mm.

Coating - silicate - wall - tiles

For decorative finish other premises lining was applied, made of aspen.Battens attached to the wooden frame set early.

horizontal - paneling -the-wall - paneling

bath of silicate blocks with their hands.Photo report

Bath - of - gazosilikotnyh - in blocks

bath project from foam blocks

Your attention is the project "Construction of a bath of foam blocks an area of ​​34.6 m2."This area is located: a covered terrace with barbecue, lounge, washing room, bathroom, steam room and a corridor.The total area inside the bath is 22.6 m, the total area of ​​the bath with terrace is 34.6 sq.m.Dimensions Centres -. 10,8h4,0 m This building is a great multi-functional decoration throughout the local area.Steam from foam blocks built with his own hands on this project will be a favorite place for the whole family

instagram viewer