floor screed for warm water floor - step by step guide + Video

To finish coat on your warm water floor laid down perfectly flat and not subjected to rapid wear on potholes and mounds - you need to carefully approach the issue of the formation of ties.

Tools Required screed

before working on the formation of ties of warm water floor supply of essential materials and tools.For the work you need otbivochnogo cord wire for fixation of Lighthouse profiles, sharp knife, electric hammer and screwdriver, wire cutters, float and trowel, to mix the solution container and conventional shovel.

Tools needed for floor screed

Necessary tools for floor screed

Materials for screeds are cement and sand.For one 50-kilogram bag of cement you will need 1.5 buckets of water and 200 kg of sand.To screed had some flexibility - we recommend that you add to the mix a plasticizer - about 150 grams of ordinary liquid soap.As beacons used metal profiles 20 to 40.

Plasticizer for floor screed

plasticizer for screed floor

most effective in warm water so-called floating floor screed, which is located on the insulating layer.As the insulation layer is usually used styrofoam slab.

Getting Started: deduce horizon

Around the perimeter of the room at a height of about half a meter draw a horizontal line.Use construction or laser level.

Print the horizon - photo

Print the horizon - photo

Weigh on the line distance to the floor, thereby defining the highest and the lowest point of the floor space.

Determine the highest and the lowest point in the room

Determine the highest and the lowest point in the room

After that, make a calculation of the required amount of materials for the tie.At the highest point of the floor to his level must add at least 4 centimeters.Draw a line indicating the upper level of your future ties.

Draw a line indicating the upper level of future ties

Draw a line indicating the upper level of a future tie

Screed: preparing a base

Perform cleaning of the room base.Then place on its surface waterproofing: film or a special solution.The next layer put a Styrofoam plate as a layer of insulation.On top place the reinforcing mesh.Then, according to the selected pattern, place the pipe water heating.

Place a pipe in front of the screed water heating

Place a pipe of water heating to tie

Set beacons for floor leveling

on opposite walls of the room in advance on the marked line of top-level ties fix dowels.We stretch between them strong cord.

We stretch strong cord to install beacons We stretch strong cord to install beacons

We stretch strong cord to install beacons

In the role of the lighthouse we will play a metal profile.It must be installed on the wooden wedges so that it coincides with the upper level of the stretched cord.

Lighthouses should be located 0.5 m from the wall at a distance less than that used for leveling screed rule.

The installation of beacons for floor screed - photo

The installation of beacons for floor screed - photo

Exhibited beacons must be firmly fixed on the floor surface.To this end, next to the profiles prisverlivaem to overlap screws ..

Note that the profile must not sag between fixings.If necessary add additional support.

Set beacons for floor screed - photos

Set beacons for floor screed - photos

Using binding wire, fasten the rails to the lighthouse screws, achieving rigid fixation lighthouses.

Hard fix Lighthouse rack with a wire

rigidly fix Lighthouse rack with a wire

On our premises perimeter laid special damping tape, which should prevent the thermal deformation of the screed.

Knead solution for floor screed

Knead solution for floor screed in the bathroom

Knead solution for floor screed in the bathroom

stirred solution of the composition described above.Liquid Soap gently add - its excess can lead to retardation.

The mixed solution in the container move on the floor and place it between the two selected guiding beacons, usually starting from the farthest corner of the room.

stacked weight solution should resemble the consistency of thick cream and a little gutter, but not to spread over the surface.

The process of laying the screed for underfloor heating

process of laying the screed for underfloor heating

aligns Laid mass of ordinary shovel.

Through Rule on the far wall for themselves shift the excess solution and level the surface screed.

Leveling cement screed using rules

Leveling cement screed with a rule

removal voids

To in the weight of the solution do not form air pockets necessary before leveling the surface of the tie to pull reinforcing mesh.The solution should cover the pipe of the water floor heating on all sides.

To avoid air pockets formed in the screed , it is necessary to constantly maintain the grid

To avoid air pockets formed in the screed must be constantly twitch mesh

Screed: to level the floor after hardening

Once you lay the tie across the flat surface is necessary to wait at least 2 weeks.All this time the screed should be regularly moistened with water.

After curing, take a scraper and remove the top layer of the screed so that the surface seemed to lighthouses.

In the next step, remove the weight of the screed metal beacons.Cut through the layer with a spatula ties (gently, so as not to damage the heating pipes), gently knock on beacons a hammer and then extract them.

We begin removing beacons of screed start removing Beacons of the screed

start removing beacons of ties

We take out the beacons of the screed

take out the beacons of the screed

The resulting groove is necessary to moisten with water and completely level them with a solution similar to that used in the formation of ties.

Fill the groove of a lighthouse with cement

Fill the grooves out of the beacons cement

With rules scraped off the excess hardened mortar, placed in the grooves.

After removal of excess are passed over the surface screed trowel.

Cut away with a sharp knife protruding remains of the damper tape

Cut away with a sharp knife protruding remains of the damper tape

At the final stage of a sharp knife cut off the excess tape damping acting on the surface of the screed.

Video - screed for warm water floor with their hands

instagram viewer