track dry mixture

There are two ways to lay paving slabs: the dry mixture and the solution of the cement.The easiest way to laying paving slabs - this is the first option.Let's see how it is done.As the mixture can be used for laying a dry mixture of cement and sand.The mixture of sand and cement is prepared in a ratio of one to four and directly before laying starts.In general, the layer thickness is three centimeters.

If the soil moist and stable, the layer can be increased, but less than three centimeters to do it is not recommended.Tile is placed with a permanent control of evenness with the level.If any "brick" acts or fails, respectively, is added to the dry mixture or slept. Important!All tiles must be at the same level, or they quickly fall out of their seats.

After work the whole surface is filled with sand and compacted so that all joints were packed mixture.Excess sand swept away from the surface, and finished area is washed with water.If it is necessary, the procedure is repeated.Before the walk can start walking, you must give it to settle and scrapie in a few days.

Application grout

The second method is laying on the cement.You can use the brand cement M 100 and knead it with sand in a ratio of one to four.He poured two centimeters thick.Worth noting that this method is often used only for installation on a concrete base, that is the site for a car blind area around the house and so on.Consider the highlights of working directly with tiles:

  • Fit decor elements presented should be implemented only with a rubber mallet striker;
  • If you want to cut a piece of tile, use only Bulgarian, in any case, do not produce chipping with a hammer;
  • Finally, excessively zealous during the shrinkage of the element in place is not necessary, because the "brick" may break.The best solution in this situation would be an extra cleaning mixture under decor element.

at once filled with no more than 0.5 square meters, it immediately and laid tile.After installation, the entire tile surface level is checked.If you have any projections, depressions or distortions, the "building blocks" get better.Dries such a solution for at least three hours, and start to operate the track only after three days.That there was a clearer process and ways of laying paving slabs, video can be used as a study.

Note!Doing track on wet solution can not only to a concrete base.If you do it on the ground, you have to perform a good and solid foundation.

methods of laying paving slabs - training grounds

To make quality track, you need to properly prepare the ground for paving slabs, it does not give the track sag and make it durable.The track is a "sandwich" of several alternately stacked layers:

  1. The bottom layer - is 15 centimeters of gravel;
  2. Next is the 10 centimeters of sand;
  3. Between gravel and sand splits geotextiles.

Digging under the profile of the track is required to use all the materials reasonable to calculate its depth.If the track is laid on the development of the site, its depth will be equal to 15 cm of gravel + 10 cm + 3 cm of sand dry mix + 7 cm tiles = 35 cm If this is done on the undeveloped area, even taken into account the level of the future lawn..So to add 35 cm 15-20 cm lawn will total 50-55 cm

When you make a base for paving tiles, per square meter of track is necessary:. In the first case, 0.35 cubic meters of excavated soil, in the second case, 0.2 cubic meter.It is therefore necessary to think in advance what to do with him.You can remove it, but it will require additional costs.It is best to use this ground for the planning of relief or filling holes.

Note!Preparation of the base under the paving tiles is one of the most important stages of the whole work, so it is not recommended to ignore.