Repair floor with his hands.How to make a screed floor video lesson

screed used for leveling the floor, strengthening the weak concrete substrates, repair of minor defects, pouring the heated floor.It is also necessary as the basis for most floor coverings.The main types of screed - cement-sand mixture (sometimes liquid and semi-dry), self-leveling compounds, combination and dry floor screed own hands with video examples - gypsum fiber technology.

before a screed floor, you should decide what is needed operational strength of ties.For residential premises is sufficient if the strength of the concrete will be equivalent to the M-150, and therefore, it is possible to use simple cement-sand mixture to a commercial or industrial premises already required polymer-equated strength to concrete M-400.

first need to be found at the highest point of the floor.If the vertical drop - 1-1.5 cm, it is recommended to use self-leveling leveling-mass if more - the cement-sand mixture.

should be put on the floor a special primer mixture to increase adhesion to concrete ties.The degree of dilution as a primer depends on the uneven floor.It is believed that if a vertical drop of up to 2.5 cm - it is necessary to dilute it to a "jelly", more than 2.5 cm - to "sour" state.

Instruments
Widget from SocialMart

screed floor with his hands self-leveling mix - the easiest way.Enough to dissolve the mixture according to the instructions and put it on the floor.Further, it is necessary to conduct a preliminary alignment of a large roller.Prior to the horizontal level of the mixture aligned itself due to high turnover.Fully mixture pick up strength after two weeks.The most common way is to tie the cement-sand mixture.

After finding the highest point of the floor, you want to install beacons.At the same time it should be noted that the screed height must be at least 3 cm above this point.Mounted alabaster beacons, or they can be installed in specially drilled holes in the floor.Now the breed mix and put on the floor.When using the filling mixture to be applied to the floor, it must be leveled and the amount of 2-meter rule, periodically checking the leveling.If it takes half-dry mixture, at first we put a base layer laid on him a metal grid and causes a second layer of the mixture, which is already aligned and a wide spatula.If necessary, the mixture can be refilled.

When coupler can withstand the weight of the body, remove all beacons and cover with foil or a damp cloth for 10 days.This creates optimal conditions for drying and the acquisition of the strength properties.Completely dry screed four weeks.

screed floor with his hands video

https: //

Below is the video technology of semi-floating screed.It is highly recommended for viewing.

Useful tips from the authors of videos listed at the bottom of a video that will help you avoid mistakes because knowing how to properly tie a floor - not flood the neighbors below.Good luck!

instagram viewer