Briefly describe the parameters that are important for the host

shelf life of such material to 30 years, he is used as a roof for buildings and as a waterproofing for bridges and viaducts, tunnels and garages, pools and channels.In all regions of Russia finds application is universal coverage, also called flashing, Stekloizol or roll waterproofing.

have surfaced roofing more advantages than disadvantages.Roll roofing is durable and flexible, does not pass water, resistant to mechanical damage and temperature changes, easy to repair.Poor in it only that it a fire hazard, and laying it requires an open flame.

organize working platform according to the rules

To install the fusing roofing, you need to prepare themselves rolls, bitumen mastic, a propane burner and an ordinary broom to sweep away the debris from the roof.The first thing you need to take care of fire safety - remove trash, rags and anything that can easily catch fire.Better to be safe and to prepare the water, sand and a shovel on the same "fire" case.

roll roofing is laid on flat roofs or roofs with a sloping angle of no more than 20 degrees.It garages, various farm building and other small objects.What was once covered with roofing material, it is now covered with roll roofing.It is much safer and more economical, given the long life of the new material.

roof, surfaced with his hands, it can be laid in two ways - you can reheat coils themselves or attach the material of hot bitumen mastic.Regardless of the method you need to stack the material in several layers for maximum isolation.When repairing a roof can be laid in a single layer, and a new roof is necessary to put at least two.

surfaced roof - carry out installation of their own hands

mount technology fusing roofing is quite simple.First, you need to inspect the roof and get rid of the projections or rods that can break through the roll.It must be remembered that the roll roofing - the last layer on the roof, and insulation or other material should already be fixed.

Then you need to remove debris.Lay the roof in a dry calm weather.If the rolls need to be transported, it is covered by car, to prevent damage to sunlight or water.Better transport vertically a number of 1-2 in height and horizontally no more than 5 rolls in height.

first layer can be attached with nails or glue hot mastic.When using mastic is applied and it is heated further by the hot coil width and length of not more than 1 meter.Then take a roll and heated part of its burner for 15-20 seconds until the signs of melting mastic.Heated roll mastic is laid on and so to continue until the first layer is complete.

rolls are stacked from the bottom up and down relative to the angle of the roof.The next roll is overlapping, to flowing water does not leak on the roof.Very useful promazyvat edge of the new roll of bitumen mastic, an additional waterproofing.

top of the first layer is placed second, with the need to heat the burner both layers to rolls stuck together.With careful and accurate work turns solid roof, which can serve faithfully for decades.Repair of roofs is very simple.You just need to cut out the damaged piece and replace with a new burner and warming promazyvaya mastic.