drain Arrangement - highlight the key points of the process

internal drainage of a private house

This moment is the lightest of all the work on the organization of sewer communications that you have to spend.The inner part of the work is connected to sewers throughout the plumbing in the house.By the way, the same demands and urban sanitation device, as such cases are not uncommon, the newly built apartment building is not equipped with all the elements of sanitary equipment, or they, simply, must be replaced.

Attention!In order to make a connection sinks, bathtub or shower stall, you need plastic pipe with a diameter of 50 mm.Regarding the toilet is used in pipe diameter of 110 mm for him.

also important to know what the tube collector.It is used to collect the effluents coming from all fittings.Its diameter is 110-200 mm, and it is also made of plastic.Among other things, take care of the slope of the collector pipe.He should be in relation to the foundation of the house of 1-5 cm. The same applies to drainage pipes outside the building.

Device features

outdoor sewerage Before understand how the sewer outside, you need to know that it includes.For this part of the communication can be attributed all the pipes that pass outside facilities, as well as all sewage treatment plant autonomous house.

At the heart of the whole system based on the principle samotёchnosti drains.Simply put, all the elements of the treatment must be below the pipeline system, which will fall into the waters of their own treatment facilities.

Tip!If you are using pumps that allow to get into waste water treatment under the pressure of the elements, the angle of inclination of the aqueduct system is not so important!

In order to prevent frequent clogging of the entire system, you must perform a couple of conditions for this:

  • Treatment elements should be located on a residential building at a distance of not less than 5 meters.
  • Throughout piping system bends should be equal to or less than 90 degrees.

use of treatment facilities at the device battery drainage

Arrangement provides for the mandatory inclusion of sewage in the whole system of local treatment elements.As a rule, those in the system are two:

  • Septic .This waste water tank asserted.
  • filter.After the waste water in septic tanks have settled, and the sediment left on the tank bottom, they flow into the filter, and where further purification takes place.

Note!The waste water filter elements can be cleaned by biological or chemical means.

All treated effluent subsequently fall or ground water, or the local reservoir of natural origin.

In that case, when it comes to seasonal housing, for example, a summer residence, it is possible to significantly reduce the cost of organizing the sewer.You can do in such a case, only a mechanical sewage treatment or to do and that is easier - buy a bio-toilet.

No matter what type or your sewage treated, it is important that it was at a maximum distance from the place of the abstraction of drinking water to prevent ingress of sewage into it!