Bath made ​​of bricks with their hands

click fraud protection

Bath has long since become one of the immutable attributes of country life.If you can not apply to the construction team or just want everything to make your hand, bath brick with his own hands will be a good investment of money and effort.The following step by step instructions, video and photo report will help in the creation of the budget bathhouse, which will stand for decades.

Content

  1. foundation brick baths
  2. Walling
  3. Roof
  4. internal bath decoration brick

foundation brick baths

Once selected place made markingsbegin equipping the foundation.The best option - strip foundation.To do this, dig a trench, from boards to put together a formwork, the bottom of the trench covered with sand (sand pillow helps distribute the load evenly).Reinforcement can be done with the help of masonry grid.Depth tab will depend on the climatic features.

This situation was made strip foundations under the bath size 2,4h4,7 m. Basement height 30 cm, width 15 cm. Concrete solution can cook yourself, you can order ready.

Since the planned construction of a bath made of brick, it is necessary to wait for the time to the foundation to survive.Time of onset of egg depends on the type and characteristics of the foundation concrete mix.

To guard against the appearance of fungus, mold, before the masonry work can be treated with a waterproofing foundations Gidroschit.

Walling

During the construction of the brick baths with their own hands is easier to use one and a half red brick.

To determine the amount of material necessary to the planned width and height of the walls to divide the multiplication between the height and width of the bricks.This method is used when laying bricks are in the same, as in this case.

Thus it is necessary to leave the ventilation gaps, schedule the windows and doors.Above the doors, window openings mounted jumpers.

Roof

Floor beams are mounted directly on the bricks in the prepared holes.The ends of the beams, which will be in contact with masonry, wrapped roofing material, only the end part remains uncovered.The easiest option - single-pitch roof.After laying the beams do a flooring of boards.

For everything waterproofing beams wrapped asbestos cloth, which is attached a stapler.When the beams are hidden on top of the applied mixture of clay and sawdust.For this roof is sufficient proportion of 2 x 2 bucket bucket.When the mixture dries, sprinkle it with sand.

requires special attention chimney place.Compliance with the recommendations of experts will help to avoid a fire.The wood must not come into contact with the chimney.This zone sewn metal sheet.

going further truss system brick baths, lathing is done.On top of laid roofing material such as slate or steel sheet.

place, where there will be an oven and place the chimney inside the building, insulated with metal.

space around the chimney in the ceiling area is insulated with expanded clay.By fitting the lower reflector is mounted.

expanded clay layer on top of another set sheet metal.

oven Rus-9 was used in the construction of a brick bath.

Interior decoration of brick

bath next step in the phased construction of the baths of bricks - the floor.Porcelain tiles - a practical and aesthetic option.To tile over the winter has not deteriorated, it is better to put it on the frost solution.

errors in the masonry quickly make themselves felt so moist spots after heavy rainfall as in the photo.If a similar problem will manifest itself, will have to miss the mark all seams.

have to do a test furnace to make after installation of the furnace and the chimney installation, that everything is done correctly.

Next you need to think about the arrangement of the floor in the dressing room.The lower part is filled with sand.On the tabs of the foundation joists are installed.

They subsequently sewn planks.Near the furnace boards are used.Then get penetration, suitable for storing small amounts of firewood.

As a result, the wooden floor create a comfortable environment for people coming out of the steam room.A granite finish area in front of the firebox ensure fire safety.

ceiling in the steam room is better to sew the lining of lime.

to the ceiling in the dressing room will suit the usual pine paneling.

walls sheathed clapboard.In places where the skin is in contact with the wall, you can not use metal fasteners.After finishing the internal space of the heating to 80 ° C was reduced to 50 minutes.

parallel with paneling made shelves.They are usually mounted in front of the furnace.They need hardwood (linden, aspen), not to burn yourself on the pitch, which will act in conifers at high temperatures.Krepjat shelves strips on wooden pins.

Like all the interior of the bath, the vents draw up wood.

Prior to registration of walls lining the water is carried out using plastic pipes.

can be used in an ordinary metal door as the front door.

oven filled with stones.

Required step instructions on how to build a sauna from a brick - is assembling the inner door, which leads into the steam room.It should only be wood, and its operation involves fasteners in a humid environment and at high temperature.

total cost of construction of such a neat bath brick - about 200 thousand rubles.We can only draw its appearance, having entered into the surrounding space.