Build Daily

Engineering Systems

August 12, 2017 18:08

Application oplombirovku water meter

click fraud protection

Sealing water meters.

Without sealing of water meters, an organization that supplies water in your area, do not hold the device registration and have to pay at the average rate, which is not economical.All rooms are equipped with standpipes for water meters in accordance with the current legislation of the Russian Federation.Meters are installed separately on the hot and cold water, with the exception of the premises in which there is a gas heater.There's hot water meter is not necessary.Application oplombirovku water meter

Water meters can be purchased and installed independently, but to seal the unit consumption of water accounts can only employees of the organization of water supply.To save your time and nerves can be trusted to carry out all work on the installation and registration of the necessary applications for the filling of the art.Then you will be 100% confident in the success and legitimacy of data manipulation.

Moscow counter sealing hot and cold water is engaged in the organization "Mosvodoupravlenie".

sealed as necessary and counters that have been calibrated after the removal, as a result of damage to the integrity of the seal.It is often the case when intervention in vodokommunikatsii after blockages or replacing the entire system.

seals installed in such a place, to be able to provide free access to them for inspection.After the sealing is not possible to dismantle the meter without breaking the seal itself, which is responsible for the integrity of the landlord.Application oplombirovku water meter

How to seal the electricity meter.

As well as water meters, electricity meters are required to seal.The checking of the meter, followed by lead seal in Moscow produces the Moscow Center of Standardization and Metrology.Seals are placed only on the counters, which have been subjected to State verification and device certificate has a corresponding accuracy class.This figure, according to a new decree № 442 from 04.05.2012 (instead of the old decree number 530 of 31.08.2006.) Of the Russian Federation "On the functioning of the retail market of electric power" governments must be 2.0 or less.Application oplombirovku water meter

body that produces electric power meter calibration, set the seal on the device casing, "locking" tightening the screws in order to not be outside interference in the design of the counter without breaking the seal itself.In order to pay for the services of electricity consumption with the new device account must be in the organization to provide energy services to submit the following documents:

  • written statement;
  • place where the electric meter is installed and the circuit it is connected;
  • technical characteristics of the new accounting tools.

Before removing the old counter, you need to invite employee and sales, which will remove the indications, if such a visit is not possible, then it is your responsibility to carry out this procedure and send the data to the address of the service organization.After sealing works, representative of the power company is composed of sealing the act in two copies, signed by both parties.One act remains with the owner and the electricity kept the prescribed period until the next sealing.Application oplombirovku water meter

instagram viewer