Why maintenance?

and gasoline, and diesel generators need to be timely inspection for the simple reason that only carried out at the right time plant operation analysis will reveal abnormalities in the functioning.Simply put, if the damage to identify at an early stage, to fix it would be easier and cheaper, but if you put off maintenance - all can result in complete failure.Schedule TO DSU - rate generator serviceability

THAT makes sure that the DSU:

  • are in working order during the entire period of operation;
  • works trouble-free;
  • works even after the allotted period of operation.

Scheduled it seems a waste of money, because the installation and so works perfectly, but its absence can result in significant costs.If you do not make a schedule for yourself THEN DSU show that the generator has been running not as efficiently as should, it is unlikely that it will.A faulty unit will start to consume more and more fuel, producing an insufficient amount of energy.As a result, savings will result in the examination, though not as visible, but it is very significant expenditure.

Daily prophylaxis diesel plant

If the generator is used on a daily basis, must be external scheduled scan.So it will be possible to detect in a timely manner reports on external monitors errors, damage or wear of components, assemblies, even notice a small leak fluid technology, to monitor the fuel level, the presence of lubrication and cooling, condition of fasteners.All this can be done independently.Schedule TO DSU - rate generator serviceability

Scheduled maintenance diesel generator

This stage control state machine is determined by the manufacturer and indicated in the documentation.In cases with different devices planned inspection step can vary from one week to two years, or even more.However, it should be understood that the manufacturer indicates the likely recommendation, calculated on the average use of the graph, and if the frequency of the launch DSU differs significantly up or down, the schedule of planned maintenance work should be adjusted depending on individual requirements.

List of works produced at the planned THAT includes not only the state of monitoring, replacement of end elements, minor repairs and cleaning and lubricating procedures and testing, control and configuration workflows.Manufacturers also regulate the step test, however, is a function of frequency and load, the procedure should be performed at least once a month (30% of load, operating time - 30 minutes or at idle for 5-10 minutes), if instructions are not specified to the DSUother test parameters.Schedule TO DSU - rate generator serviceability

TO DSU after developments

Hours obliged to make maintenance.Although the schedule THAT DSU show the device status after the active operation is necessary at the time.If you wait for the due date, without ceasing to work, can aggravate the situation in the bud.

During this process:

  • replacement of oil, condensate removal, flushing the cooling system;
  • replacement of used consumables (filters etc);
  • adjustment, adjustment of the valves, speed, stress, tension drive belts, remote control;
  • calibration supports DSU;
  • check crankcase ventilation level, tightness lubrication system;
  • tightness of supply engine cooling system;
  • checking and cleaning a duct, the valves, the compressor;
  • check tightness and cleanliness of the fuel system;
  • check management system, the adequacy of the response of electronic components.

Thus every single maintenance of the diesel generator is different in composition work from the previous due to the emergence of new wear hazards and so forth.

Schedule TO DSU

Show in general terms, how to manage the installation and how often it is necessary toto do this, help schedule diesel generator inspection.Of course, it must be individually for each individual model in every single environment.Inexpensive and not too reliable generator will have to bring to the diagnosis after a few hundred hours of active work, while models from recognized manufacturers need less monitoring.

In most cases, the first maintenance (TO-1) should be done every 50 m / h: prevention, replacement of oil filter and oil.

second (TR-2) is required for every 250 m / h: in addition to the above works replace the fuel filter.

As for individual graphics: it is better not to take risks and to make inspection and preventive maintenance as often as the manufacturer recommends.Schedule TO DSU - rate generator serviceability