Installation of drywall partitions as an option for redevelopment

click fraud protection

Preparations

Before you start the installation of drywall partitions, you must decide with the partition structure.This is done on the basis of operating conditions, while taking into account all the requirements for fire resistance and sound insulation.In general, the installation of the technology consists of several stages: the room layout, installing the frame, mounting drywall sheets of the first layer, the insulation layer device, assembling sheets of the second layer.

Note!Work on the layout should begin after you have made all "wet" work.

markup begins with the floor, and then using the plumb line is transferred to the ceiling.Next on the attached marking guide profiles at a distance of one meter from the walls and ceiling.In the same manner are mounted near-wall rack profiles.All other sections must be cut, focusing on the height of the room with a maximum tolerance of ten millimeters.

Installation of drywall partitions: stepping

After the marking and installation guide profile begins installing drywall partitions.The sequence works as follows:

  • mounting racks.First strut inserted in the floor profile and then - in the upper profile.It should enter into the guide on the ceiling at least 20 millimeters.After that, the profile should be to align the vertical step between the axles - 600 mm.The open side must face towards the drywall installation, the so-called German technology.An alternative is the American way of mounting when it is directed toward the only trim profile;
  • Sheathing first hand.Boarding starts with sheets of drywall width of 1200 millimeters.For their fastening screws used for metal.The length of the screws - at least 25 millimeters, and a step of installation - 250 millimeters.If the two-layer plating is done, the screws are screwed in increments of 750 mm;
  • Laying insulation.After the completion of the first plating side partition in the cavity need to mount the necessary communications.After this layer is placed a mineral or glass wool.Their thickness should be such that the cavity is tightly closed;
  • Installation of the second party.When laying a second hand is necessary to shift the sheets 600 millimeters in relation to the first side of the sheets.

Important!Profiles to be used during mounting, must be made of galvanized steel and high strength to firmly hold the entire structure.

seams Processing After installation of sheets of drywall you need to putty all joints.To this end, a spatula, a layer of putty, and traffic is evenly distributed from top to bottom along the seam.All remnants of the mixture is removed.Once the plaster has hardened, it is glued on top of the reinforcing tape, which is pressed with a spatula.Next wider spatula over the tape is applied another layer of putty.When the layer has dried, it must be treated with sandpaper.
If the partition has the outer corners, it should be for them to put on corner profiles.Lay them on the applied layer of putty, and the top covered with another layer.Inside corners smeared and glued over putty reinforcing tape.

Note!For internal corners reinforcement tape should be bent at a right angle.

Finally a few important points.Firstly, if the installation will take place in areas with high humidity, it is necessary to use a moisture-resistant drywall.Secondly, in these areas no harm will be put between sheets of waterproofing layer.And, thirdly, it is necessary to consider all communications so that they were not damaged during the tapping screws.For greater clarity, and clarity, it is recommended to see how to make the installation of drywall partitions, video installation where a lot of the Internet.