Build Daily

Engineering Systems

August 12, 2017 18:08

Rainwater drainage, to live in harmony with the elements

click fraud protection

What is the work of a rain drain system?

Some owners built the house, limited to the system tray, which are mounted at the edge of the roof.The water flowing down from the roof, falls into the tray and flows to a water pipe.From the pipe, it flows into the discharge chute or, worse yet, runs directly on the blind area home.Because of this foundation and blind area may crack, while heavy rainfall can be flooded and the ground floor, if any.

To avoid this, you need all the water taken out of the area or take it to a collector. device rainwater drainage prevents flooding of basements, the destruction of the basement, backyard soil waterlogging.Livnevki consists of the basic elements: gutters, channels, trays for transporting sediment trays to collect water from the surface, gullies, drainage, manholes.

device rainwater drainage of the upper level

Before buying the necessary materials, you need to make livnevki project.He will calculate the amount of materials needed and make a rough estimate.Calculation of a rain drain system will require to take into account several important factors: the intensity and amount of rainfall, terrain, surface areas from which water is to be collected.

trays and piping system going, as a designer.Nothing complicated about it. places the individual elements of the compounds required to thoroughly seal the .The trays are suspended in compliance with the slope with the help of special brackets that attach the edge of the roof.

gutters are fixed to the wall of the building clamps and attached to the trays.But, as has been said, this system is not the end, it takes even more facilities, which will be allocated all the water from the foundation to a safe distance.

ground part of a rain drain

Laying of sewer pipes under the ground - the process expensive and time-consuming.To save money and time, you need to maximize the use of rain drainage system on the surface of the tray.Typically, these trays are installed along the roads or sidewalks.Under the downpipes and the lowest places set storm-water inlets, which by means of communicating tubes connected to the storm sewer, you can also bring them to the drain pipe.

To avoid falling into a rain drain pans debris and sand, and as a result, clogging of sewer pipes, the whole system is equipped with peskoulavlivatelyami and protective grilles.

all the moisture out of the inlets enters the main outlet pipe and from there into the central sewer.If there is no sewage system, you will need to dig several interconnected wells.Wells, as well as central drainage, are the end point for the accumulation of all the collected water to the site.It should not overflow the wells, so they need to dig deep enough.

After all the work you want to test spilling from the roof, and the downstream flow.Care livnevki quite simple.It is necessary from time to time to clean gullies of sand and accumulated debris.To build a rainwater drain, you can once and for all get rid of many problems and extend the life of the home.

instagram viewer